| | Highways Agency - A27 Polegate Bypass |
 | | Construction of the Polegate Bypass started in July 2000 and the road was opened to traffic in June 2002. |
 | | This was to include an eventual connection to the Polegate bypassscheme at Dittons, but could not come into effect until the A27 scheme had been built. |
 | | It also means that residentswhose town has been divided in two by the A27 trunk road and had suffered from its noise, air pollution and traffic delays, will be able to create a closer community again. |
| www.highways.gov.uk /roads/projects/3944.aspx (308 words) |