| |
| | Gemini Agena target vehicle 5003 systems exercised. |
 | | Following the early termination of Gemini VIII, Gemini Agena target vehicle (GATV) 5003 remained in orbit, where its various systems were extensively exercised. |
 | | The main engine was fired nine times, four more than required by contract, and 5000 commands were received and executed by the command and communications system, as against a contractural requirement of 1000. |
 | | Before that, however, all attitude control gas was vented overboard to preclude errant thruster malfunction, and the vehicle was placed into a 220-nautical mile circular decay orbit, one of the secondary objectives of the Gemini VIII mission. |
| www.astronautix.com /details/gem21782.htm (161 words) |
|