Factbites
 Where results make sense
About us   |   Why use us?   |   Reviews   |   PR   |   Contact us  

Topic: Anchor handling tug supply vessel


Related Topics

In the News (Thu 31 Dec 09)

  
  OFFSHORE
The Lady Astrid is designed and built to undertake supply duties between land base and drilling sites, towing, assist during tanker loading, establishing tow of threatening objects etc. The vessel is specially designed and equipped to accommodate the handling and usage of the specialized equipment employed in deep water anchor handling, i.e.
Forward of the working deck is a waterfall-type towing/anchor handling (AHT) winch, made by Rauma Brattvaag, and supplied by Rolls-Royce, which also supplied two tugger winches on each side of the main deck forward and the windlass/mooring winch on the forecastle deck together with the capstans on aft deck.
The AHT winch have one drum for anchor handling and one for towing, both with a capacity of 4,500 m of 80 mm wire, a pull of 380 tons, and brake holding power of 550 tons on first layer.
www.marinelog.com /DOCS/PRINTMMIII/MMIIIoff1a.html   (1043 words)

  
 Shipping Dictionary - Glossary
Offshore vessel used for jobs such as the relocation of oil rigs and anchors of the oil rigs.
Vessels used to transport ammonia and liquid gases (ethane, ethylene, propane, propylene, butane, butylenes, isobutene and isobutylene).The gases are transported under pressure and/or refrigerated.
Dry bulk vessel with the maximum dimensions for passing through the Panama Canal (width of 32.21 metres and length of 289.5 metres) of approximately 60,000—80,000 dwt.
www.skibskredit.dk /Default.aspx?ID=503   (1071 words)

  
 Ship Technology - Olympic Octopus - Tug
The Octopus name was chosen because of the novel flexible arms which form part of the anchor handling operations.
For anchor handling and towing there is a two drum Rauma Brattvaag hydraulic main winch rated at 400t pull, and a 138t pull secondary winch.
The vessel is classed by DNV under the notation +1A1, TUG, SUPPLY VESSEL, E0, SF, DYNPOS AUTR, TMON, COMF-V(3), CLEAN, ICE-C, OILREC (NOFO2004).
www.ship-technology.com /projects/olympic-octopus   (633 words)

  
 Platform supply vessel - Wikipedia, the free encyclopedia
Platform supply vessel (often abbreviated as PSV) is a ship specially designed to supply offshore oil platforms.
The primary function for most of these vessels is transportation of goods and personnel to and from the offshore oil platforms.
Some of the larger vessels carry 20 to 30 people, as many as half of them could be crew, the remainder being specialist such as scientist, geologists, or people involved in any of the many jobs related to operations on the oil rig.
en.wikipedia.org /wiki/Platform_supply_vessel   (293 words)

  
 Menkent.dk - Tales of a Modern Seafarer --> Pictures from Maersk Assister   (Site not responding. Last check: 2007-10-22)
When the anchor is deployed on the bottom, the oil rig heaves in on the anchor chain until the tension reaches a disered value.
The anchor chain should have been laying on top up the anchor in stead of beneath it, but a lot of factors have to be right in order for an anchor to be retrieved correctly.
With the anchor chain pulled off the anchor and to the stern of the vessel, the anchor is now towed abow with the tugger winches for storage until deployment at the oil rig's new drilling site.
www.menkent.dk /picassister.html   (3499 words)

  
 Bourbon / Offshore / Fleet of vessels / AHTS
AHTS vessels are used to install and maintain oil platforms.
They are equipped with powerful engines and winches and are used to tow equipment for setting and retrieval of anchors and deployment of other oil production-related equipment.
Anchor handling tug supply DP 2 for deep water operations
bourbon-online.com /AHTS,424   (185 words)

  
 Edison Chouest launches 348-foot anchor-handler   (Site not responding. Last check: 2007-10-22)
“ The vessel is certainly large enough to hold all of the wires, suction piles and necessary liftings,” White said.
The largest vessel in ECO’s 150-boat fleet, the Laney Chouest is currently at work on a multiyear contract for Shell Offshore in the Gulf of Mexico.
The three remaining 280' series vessels are scheduled for completion by the end of the year.
www.workboat.com /archives/03may/otw_3.htm   (422 words)

  
 MaritimeDigital Portal - (c) Frederic Logghe
Completion of the vessel is expected to be the third quarter of 2008.
The company said the 60-metre vessel would be able to perform as a safety vessel for offshore drilling and workover rigs on 24 hours a day basis.
Tanjung said the vessel could also be used for fire fighting, provision of supply and transportation of equipment and cargo between offshore facilities and platforms.
www.ibiblio.org /maritime/Portal/News/newsmessage.php?var_id=1725   (166 words)

  
 Progress-Technique » Orderbook
These three new vessels are to be upgraded versions of the very successful VS483 design of PSV already in service with Sealion Shipping Ltd and others in the North Sea.
The hulls of the tugs are being built in Northern Shipyard SA.
The vessel will be sister vessel to yard no. 200, wich are under construction at same yard for same owner.
www.progress-technique.nl /index.asp?pagina=orderbook   (1045 words)

  
 Anchor handling tug supply vessel - Wikipedia, the free encyclopedia
Anchor Handling Tug Supply (AHTS) vessels can supply oil platforms, tow them to location, anchor them up and in a few cases can serve as an Emergency Rescue and Recovery Vessel (ERRV).
AHTS differ in the most part from Platform Supply Vessels (PSV's) as they are fitted with winches for towing and anchor handling and have an open stern to allow the decking of anchors, plus more power to increase the bollard pull.
An offshore shipbroker specialising in procuring these types of vessels
en.wikipedia.org /wiki/Anchor_handling_tug_supply_vessel   (125 words)

  
 [No title]   (Site not responding. Last check: 2007-10-22)
She remained in the form of a seismic vessel until the early 90's when she was once again converted, only this time to a maintenance / crane ship.
The vessels role is as both a seismic source boat and a data boat.
As a source boat the vessel produces 2000psi of compressed air that is fired through the four gun arrays that are towed behind the vessel.
www.freewebs.com /9v5935/titanhistory.html   (326 words)

  
 Aker Yards ASA, Aker Yards to build Multifunctional Anchor Handling Tug Supply Vessel
Aker Yards to build Multifunctional Anchor Handling Tug Supply Vessel
Handling / Tug / Supply Service Vessel to Farstad Supply AS in
Supply have further signed an agreement for optional 1 + 1 UT712L
www.pressemeldinger.no /read.asp?recno=1361   (333 words)

  
 Tug - Commercial Boats for Sale
Anchor Handling Tug Supply Vessel 63m 80 Tons Bollard Pull
Twin screw Anchor Handling Tug/Supply Vessel completely outfitted and equipped for Anchor Handling, Towing Rescue, offshore supply and other related duties.
The Vessel will be classed as Anchor Handling Tug/Supply Vessel for Unrestricted Service.
www.commercial-boats-for-sale.com /commercial_boat_type_Tug_page1.aspx   (73 words)

  
 ABS Surveyor - March 1999   (Site not responding. Last check: 2007-10-22)
For anchor handling and towing, the vessel is fitted with a Smatco electric-driven combination traction and drum winch.
Hvide Marine is to supervise construction and operation of the vessel, while Aker Marine Contractors is its commercial manager with responsibility for directing the vessel's work and contracts in the anchor handling and construction markets.
The 16,000 hp vessel will have a 65 ft beam and 26 ft depth and come equipped with a diesel/electric Z-drive, azimuthing main propulsion system, dynamic positioning capability to DP 2 requirements, and will generate approximately 180 tons of bollard pull.
www.eagle.org /NEWS/pubs/SURVEYOR/mar99/ahts.htm   (485 words)

  
 MODEL SLIPWAY - RADIO CONTROL SCALE SHIP MODELS - AZIZ Anchor Handling Tug/Supply Vessel   (Site not responding. Last check: 2007-10-22)
Built for worldwide operations to service and tow drilling units, and support production platforms Aziz and her sistership Arif were two of six AHTS vessels with fire fighting equipment operated by Prince Offshore, Sharjah, United Arab Emirates, in the summer of 1983.
Each vessel is fully air-conditioned for hot and cold climates and berths are provided for 11 crew and 12 passengers.
A twin screw representative model of an anchor handling tug/supply vessel based on Aziz and Arif as delivered to Prince Offshore in 1983.
www.hobbycentre.com.au /Aziz.html   (477 words)

  
 EuroInvestor.co.uk - SBX New shallow water 2D/3D vessel
The vessel is a new-built Anchor Handling Tug Supply (AHTS) vessel and will be converted into a shallow water 2D/3D vessel and re-named the "Raven Explorer".
The vessel is expected to be operational in the second quarter of 2007.
All statements in this press release other than statements of historical fact are forward-looking statements and are subject to a number of risks, uncertainties and assumptions that are difficult to predict, and are based upon assumptions as to future events that may not prove accurate.
www.euroinvestor.co.uk /News/ShowNewsStory.aspx?StoryId=9465940   (736 words)

  
 RIGZONE - GulfMark Offshore Announces Six Vessel, $140 Million New Build Program
The vessels are of a new design developed with the builder and incorporate Dynamic Positioning 2 (DP-2certification) and have a large carrying capacity anticipated to be in excess of 2,700 tons.
The timing of our new vessel deliveries is scheduled to coincide with the completion dates for the new construction, high specification jackup and floater rigs that are due to peak in late 2007 through 2008.
These vessels, when coupled with the newly delivered Sea Intrepid and its sister vessel due to be delivered in the first half of 2006, will reduce the average age of our fleet in Southeast Asia by nearly 40%.
www.rigzone.com /news/article.asp?a_id=26910   (656 words)

  
 OSV OUTLOOK
It has just announced orders for eight vessels to be built in the Far East: five large 280-foot anchor handling towing supply vessels with greater than 20,000 horsepower and three 260-foot platform supply vessels.
North American Shipbuilding is preparing to convert the Margaret B. Chouest, currently the largest vessel in the Chouest fleet at 320 ft, to the largest offshore supply vessel in the U.S. market.
The vessel will be equipped with the largest winch system ever installed on an anchor handling vessel, producing a 600 ton pull.
www.marinelog.com /DOCS/PRINT/jjmmioff.html   (958 words)

  
 Halifax Shipyard Celebrates
This offshore supply vessel is the 88th vessel to be built at the Halifax Shipyard.
The first new vessel ever built at the Halifax Shipyard was the Canadian Mariner a freighter - one of four sister ships - built in 1921.
The new AHTS vessel marks a new class of sophisticated ship, as the yard works to develop a niche in Nova Scotia’s emerging offshore industry.
www.jdirving.com /Index.asp?Site_Id=1&Page_Id=384   (605 words)

  
 [No title]
When the vessel is in a dynamic position, the shape of the bottom limits the effects of eddies and banging.
In choosing this type of vessel, we are setting a radically new standard for the future of offshore supply vessels.” From the beginning of this project, Bourbon Offshore Norway, strongly encouraged by Statoil, partnered with Ulstein Design and ODIM to develop a solution to improve personnel safety on the rear deck of the vessel.
This collaboration produced the SAHS System (Safe Anchor Handling System) which eliminates any human presence on the after deck of the vessel during the most dangerous operations to ensure optimum protection of the crews.
www.marinelink.com /Story/ShowStory.aspx?StoryID=203551   (947 words)

  
 Seabulk Offshore Home Page   (Site not responding. Last check: 2007-10-22)
SEABULK OFFSHORE is the largest subsidiary in the Seabulk International organization, serving a global market and offering a large and diversified fleet of offshore support and specialized vessels to meet your specific needs.
We can provide a comprehensive package to meet your requirements, from the smallest line handling tug or fast crew/utility vessel to the largest platform supply vessel or anchor handling tug supply vessel.
Our diversified fleet of modern and well-maintained vessels is manned and managed by a team of seasoned mariners whose experience and collective know-how are second to none.
www.seabulkinternational.com /ourCompanies/seaBulkOffshore/content.htm   (155 words)

  
 Operator provides update on newbuilding programme - Offshore Shipping Online
The vessel, which is a UT 745L design platform supply vessel, will be included in Stolt Offshore AS's general contract with Norsk Hydro AS for the delivery of subsea services.
Far Saga will work as a supply vessel for Norsk Hydro until the necessary equipment has been installed and it is mobilised for subsea services.
At the end of October, Lady Guro, a UT 719-2 design multipurpose vessel, was delivered to IOS (Farstad's JV with P&O) by the Korean shipyard INP Heavy Industries Co Ltd and entered a five year charter contract with Shell Philippines.
www.oilpubs.com /oso/article.asp?v1=2962   (515 words)

  
 Donjon Marine Co., Inc. (News Archive - June 2, 1997)
On May 27th, Donjon Marine's U. flagged anchor handling/tug supply vessel, ATLANTIC SALVOR, completed the tow of the fully laden 50,000 dwt bulk ship M/V BOREAS, with a 41½' draft, from Port Canaveral, Florida to Kalamaki, Greece, averaging an incredible 8 knots.
Over 5,200 miles were logged as the tug towed the ship on its 2,100'of 2¼" wire across the Atlantic Ocean and the Mediterranean Sea, stopping in Bermuda and Gibraltar to take on fuel and water for both the tug and the ship.
In just 96 hours after the contract had been signed with Wijsmuller the tug was alongside the ship transferring fuel and water and making preparations for the tow.
www.donjon.com /n-970602.htm   (407 words)

  
 Seabulk International Acquires Newbuild Platform Supply Vessel
The 5,500-horsepower, 236-foot vessel will join the Company's West African fleet, which presently comprises 42 vessels ranging from crewboats to sophisticated anchor handlers.
PSVs are large, multipurpose vessels used to ferry equipment, supplies and personnel to offshore platforms and rigs engaged in the production of crude oil and natural gas.
These two vessels -- the Seabulk Padamyar, a 3,800-horsepower anchor-handling tug/supply vessel, and the Seabulk Nylar, a 3,800-horsepower PSV -- have secured three-year contracts with two option years with a major international oil company.
www.prnewswire.com /cgi-bin/stories.pl?ACCT=104&STORY=/www/story/01-17-2003/0001874243&EDATE=   (390 words)

  
 Association Of Singapore Marine Industries - ASMI News 2004 : 2nd Quarter : Industry News
The vessel was cut in Z shape and inserted with a mid-ship section of approximately 1,100 tonnes.
The main winch of the vessel is a Brattvaag triple drum waterfall winch unit with a brake capacity of 450 tonne with line pull of 300 tonnes 0-7m/min at first layer.
The vessel which has approximately 550 sqm of clear deck space and the ability to carry approximately 1000 tonnes of deck cargo is suitable for towing various types of rigs anchor handling and supply run.
www.asmi.com /index.cfm?GPID=73   (2901 words)

  
 Hydro signs new contract with "Bourbon Orca" (Scandinavian Oil-Gas Magazine)   (Site not responding. Last check: 2007-10-22)
While the "Skandi Admiral" is used to a large extent in the northern areas, the two Bourbon vessels play a key role in Hydro's operations in the North Sea.
The modern AHTS vessel "Bourbon Orca" has the "Ulstein AX104" design, known for its special hull shape and bow formed in the shape of an axe, that together create the so-called "Ulstein X-Bow" that cleaves the waves.
With its excellent properties in areas such as safety during anchor handling and crane operations, seaworthiness, towing, and energy consumption, the vessel will make a valuable contribution to Hydro's marine operations from the Mongstad base.
www.scandoil.com /moxie/news/company_news/hydro-signs-new-contract-.shtml   (310 words)

  
 MENAFN - Middle East North Africa . Financial Network News: Halul receives first AHTSV built by Indian shipyard - Qatar
This vessel is the first of four AHTSVs ordered by HOSC as a part of modernising their fleet.
Halul 24 is designed for multi-role activities on anchor handling, towing, supply, fire fighting, rescue operations.
The vessel can carry a deadweight of 1750 tons and is highly sophisticated with Unmanned Machinery Space, state of the art communication facilities and Joystick Maneuvering controls.
www.menafn.com /qn_news_story_s.asp?StoryId=1093125918   (268 words)

  
 Colombo Dockyard moves full steam ahead
CDL has been the principal supplier of these type of boats to this client over the past three decades.
In addition to these boats, one 58 Ton Bollard Pull Tug Boat out of a three boat order, was also delivered to the client A. Turki Corporation (ATCO) of Saudi Arabia during the last quarter of 2006.
The second and third Tug Boats are scheduled to be delivered within the first quarter of 2007.
www.sundaytimes.lk /070114/FinancialTimes/ft311.html   (280 words)

  
 Farstad Shipping ASA - MGN Business Card Listing
The company's fleet of vessels consist of AHTS (anchor handling tug supply vessel) and PSV (platform supply vessel) and is supporting offshore rig activities and other offshore related activities in different regions.
In addition 6 vessels are under construction for delivery from 2003 to 2005.
Of the Farstad fleet, 31 vessels, 24 excisting vessels and 2 newbuild are owned by Farstad Supply AS, 5 vessels are owned by Farstad Shipping Ltd. The remaining 18 vessels and 1 newbuild are within P/R International Offshore Services ANS (IOS), a company owned by Farstad Supply AS and Farstad International AS (The IOS Fleet).
www.mgn.com /companydetails.cfm?companyid=22818   (200 words)

Try your search on: Qwika (all wikis)

Factbites
  About us   |   Why use us?   |   Reviews   |   Press   |   Contact us  
Copyright © 2005-2007 www.factbites.com Usage implies agreement with terms.