 | | The Ashland, Bayfield, Douglas and Iron Land Conservation Department assembled a review team to evaluate possible demonstration sites, of which five were reviewed. |
 | | The Bayfield County site included 2,500 linear feet of road ditch shaping, 330 linear feet of silt fencing, 23.7 tons use as outlet protection, one culvert replacement (rebedded and packed), one acre seeding and one acre of mulch, non-woven geotextile for firm outlet bed, and erosion control matting placed and anchored. |
 | | The Douglas County road ditch deposited water and sediment directly into Lake Superior, while the Bayfield County project formerly deposited sediment into an intermittent stream, to a trout stream, and eventually to Lake Superior. |