| | MAHARASHTRA Electricity Regulatory Commission |
 | | The Respondent should be ordered to prepare a comprehensive scheme and to obtain necessary sanction from the Competent Authority for better and efficient supply of electricity with proper voltage to powerloom and domestic consumers within the limits of Bhiwandi Nizampur City Corporation. |
 | | The SE, Bhiwandi submitted that wherever the meters are found faulty, the said consumers have been charged on average basis till the meter is replaced. |
 | | The Respondents should be penalized for non-implementation of the orders of the Hon’ble Commission of installation of meters and for increased TandD loss as the Hon’ble Commission may determine. |