| |
| | [No title] (Site not responding. Last check: 2007-10-19) |
 | | Services included the survey study, preliminary design, detailed design, preparation of bill of quantities, cost estimates, bid documentation and preparation of operation manual for 10,000 m³ capacity WTP within the scope of 400 l/s industrial water supply from the Gediz river to Aliağa refinery. |
 | | Services included the survey study, preliminary design, final design, preparation of bill of quantities, cost estimates and preparation of specifications for 220,000m³/day capacity WTP within the scope of potable, domestic and industrial water supply to Balıkesir. |
 | | Preparation of priced bill of quantities in Turkish and English in accordance with DSI standards, for construction, electrical and mechanical works of WTP. |
| www.suyapi.com.tr /suaritma-e.html (392 words) |
|