 | | Project Setting The Project will be located along a 5.7-mile section of the upper reach of the Guadalupe River between Interstate 280 and Blossom Hill Road, and along 0.3 miles of Canoas and 1 mile of Ross Creeks, both tributaries to the Guadalupe River. |
 | | The proposed design would convey 11,400 cubic feet per second (cfs) from Blossom Hill Road to Ross Creek, 12,400 cfs from Ross Creek to Canoas Creek, and 14,600 cfs from Canoas Creek to Interstate 280, within the active channel and the proposed bypass channel without flooding the surrounding areas. |
 | | The proposed Project would also provide access roads, which are needed to perform regular maintenance such as vegetation control, erosion repair, and debris removal. |