| | Articles - Mass Rapid Transit (Singapore) (Site not responding. Last check: 2007-08-04) |
 | | With this extension, the North South Line was reconfigured to include the three stations on the former Choa Chu Kang Branch Line (Jurong East station, Bukit Batok station, Bukit Gombak station and Choa Chu Kang station), forming a continuous line from Jurong East MRT Station to Marina Bay MRT Station. |
 | | With the system in Bukit Panjang experiencing lower-than-expected ridership in its earlier years, several feeder bus services to the estate were removed or amended to encourage ridership, much to the chagrin of many local residents. |
 | | Public confidence in the overall LRT system was so low, that when SBS Transit announced the commencement of operations in her system in Sengkang, much emphasis was made on the different rail system that has been adopted, as well as constant reassurances on reliabiliy and safety. |
| www.xclimbing.net /articles/Mass_Rapid_Transit_(Singapore) (5635 words) |