| |
| | EPRI Portfolio 2006 - P162.002 Advanced HVDC Systems at +/- 800 kV and Above |
 | | Conductor bundles: Questions remain about the optimal conductor selection (type, configuration, and size), number of conductors, and the size of the bundle. |
 | | However, as DC voltages are increased, these issues will require further research and consideration, particularly to elucidate the relationship between conductor bundle trade-offs and corona, AN, and RI. |
 | | While the order of topics directed by members, it is proposed that conductor bundle design, audible and radio interference, long-term performance of line insulation, and the design of transformers be addressed during the first phase of the project. |
| www.epri.com /portfolio/product.aspx?id=1437 (1024 words) |
|