  Knowledge, Strength, Agility
The CVNX 1 propulsion plant will be designed--using lessons learned from the most recent submarine power plant designs--for simplicity, reduced maintenance and manpower needs, and the ability to support future warfighting upgrades.
CVNX 2 will be able to respond to any crisis and handle any mission in the future, whether it is a warfighting mission or a humanitarian mission, in the most cost-efficient manner possible.
The modernization and upgrades projected--and needed--for CVN 77, CVNX 1, and CVNX 2 are essential to ensure that the Navy's carrier force of the next millennium is able to maintain supremacy at sea.
www.navyleague.org /seapower/knowledge_strength_agility.htm   (2900 words)

  
  CVN 21 / CVN-X / CVX
The CVNX is optimized to support the next-generation Navy combat aircraft such as the Super Hornet and the Joint Strike Fighter.
The CVNX features a substantially smaller redesigned command "island" (the carrier superstructure) than current aircraft carriers, as well multifunction arrays that replace the forest of antennas that current ships sprout, making the carrier inherently harder to detect and attack.
CVNX 1, which will replace USS Enterprise (CVN 65) in 2013, was initially scheduled to begin construction in 2006.
www.globalsecurity.org /military/systems/ship/cvx.htm   (869 words)

  
 Carrier Adrift: Delaying CVNX Has Big Consequences
The Navy's candidate is its next-generation aircraft carrier, CVNX ("CV" for carrier, "N" for nuclear, and "X" for experimental).
Prior to mid-summer, most people assumed the only reason CVNX was on the list was so there would be one program from each service.
Because Enterprise is a costly ship to operate (40 years old, 8 nuclear reactors), nobody will be willing to spring for that bill and the fleet will lose a carrier.
lexingtoninstitute.org /printer_99.shtml   (512 words)

  
 CVN-21 (formerly CVNX) Aircraft Carrier - Starsiege:2845 Forums   (Site not responding. Last check: 2007-10-10)
CVNX will have stealthier features than current carriers but will not be a completely stealth design.
To maintain the schedule for CVNX 1 and deliver these needed pieces of machinery as required by the construction sequence, the Navy needs to obligate funds for some of these components in fiscal year 2001.
Davis secured $160 million to focus on the construction of the CVNX carrier, helping to move the construction date back to 2006 and saving jobs that may have been lost if the construction timetable was put off.
www.starsiege2845.com /forums/index.php?showtopic=1954   (2609 words)

  
 Navy League of the United States - Citizens in Support of the Sea Services
Since 1993, the Navy has pursued a two-track plan to modernize its carrier forces and to ensure that future carriers and air wings are completely integrated "systems of systems" that can serve throughout the 21st century.
"The conclusion was to pursue a nuclear-powered CVNX that would have an air wing of 55 to 75 CTOL aircraft," Knapp said.
The Navy is doing all this at a fraction of the cost that it would have taken to "leap" from the reactor technology in USS Nimitz in the mid-1960s directly to the CVNX1.
www.navyleague.org /sea_power/jun_01_05.php   (1814 words)

  
 CVN 21 / CVN-X / CVX - Design
Innovations for the next-generation aircraft carrier include an enhanced flight deck with increased sortie rates, improved weapons movement, a redesigned island, a new nuclear power plant, allowance for future technologies and reduced manning.
Other features of the CVNX being proposed by ONR include real-time damage detection and dynamic magazine protection.
The Department of Defense and the Navy stated on 19 December 2002 that they had decided to rename the CVNX program CVN-21 and that the first ship would have 80 percent of the kinds of new capability that was anticipated by the time the Navy would have reached the CVNX-2.
www.globalsecurity.org /military/systems/ship/cvx-design.htm   (1474 words)

  
 [No title]   (Site not responding. Last check: 2007-10-10)
CVNX The CVNX Class will use an evolutionary, multi-ship process for inserting new technologies that will enhance warfighting, enable critical features for future flexibility, and dramatically reduce total ownership cost.
CVNX 2 will receive hull improvements that include survivability improvements to meet new threats, and improvements to distributive systems such as heating, ventilation, and air conditioning, as well as incorporating the latest technologies to improve storage and food service.
Achieving the CVNX vision and TOC reductions will require significant design changes and incorporating technology advances that have become available since the NIMITZ Class was designed over 30 years ago.
www.chinfo.navy.mil /navpalib/testimony/acquisition/buch0421.txt   (3095 words)

  
 Cvnx Aircraft Carrier - Airplanes BR   (Site not responding. Last check: 2007-10-10)
CVNX, the centerpiece of the next generation carrier Fleet, … This next generation aircraft carrier will be achieved at an affordable, …
… In the latest round of carrier introspection, the CVNX AOA examined: (a) … CVNX that would have an air wing of 55 to 75 CTOL aircraft " Knapp said.
National Missile Defense … Navy plans to begin construction on a new type of aircraft carrier, the CVNX.
airplanes.br.com /cvnx-aircraft-carrier.html   (437 words)

  
 sea-carrier
At a time when debate is raging among US naval analysts over the design of the next generation of USN aircraft carrier (CVNX), proponents of a large-deck carrier are using current military actions in the Middle East as an example of the power only large-deck carriers can sustain.
In February of 2001 the USN awarded a $3.8bn contract to Newport News Shipbuilding for the design and build of CVN-77; a clear sign the USN has committed to large-deck carriers, at least for the forseeable future.
Although at first the CVN-77 appears to be an increment in the USN’s carrier fleet, she incorporates design changes which, represent a steady transition by the USN towards what will eventually be the CVNX design.
www.global-defence.com /2002/test02/sea-carrier.html   (1568 words)

  
 2002 Edition: Vision...Presence...Power (Chapter 3 continued)   (Site not responding. Last check: 2007-10-10)
Since the mid/late-1960s when the baseline CVN-68 design was finalized, the Navy's carrier force has not had the advantage of an aggressive and robust research and development program to insert leading-edge technologies and systems into subsequent hulls.
The principal design objectives for the CVNX class are to provide a flexible infrastructure that will facilitate the insertion of new warfighting capabilities as they evolve and reduce total ownership costs significantly during each carrier's 50-year service life.
A multi-year research and development program is also underway for CVNX, the first unit of which is planned to be requested in FY 2006 for an FY 2013 delivery to replace the USS Enterprise and sustain minimum-essential carrier force levels.
www.chinfo.navy.mil /navpalib/policy/vision/vis02/vpp02-ch3g.html   (2156 words)

  
 All Wood Wings: Nimitz Class Aircraft Carriers: CVN-68 Nimitz - quality ship models crafted from wood
CVN-77, the 10th and final Nimitz-class carrier, will be a transition ship to the new CVNX class of aircraft carriers, incorporate new technologies applicable to CVNX and so will differ considerably from earlier Nimitz class ships.
Technological improvements to prepare for the CVNX ships began in CVN-76 with the Ronald Reagan who has a re-designed bulbous bow for increased propulsion efficiency and trim stability.
CVNX - the centerpiece of the next generation aircraft carrier fleet - will be a large-deck, nuclear-powered ship with a newly designed combat system that eliminates rotating antennas.
www.allwoodwings.com /Ships/Military/AircraftCarriers/CVN-68,Nimitz,Class.htm   (718 words)

  
 Matthew J. Mulherin Appointed Director Of Cvnx Program At Newport News
In this position, Mulherin is responsible for the company’s design and development efforts for the U.S. Navy's new generation of aircraft carriers, CVNX.
Mulherin will report to NNS Executive Vice President and COO Tom Schievelbein who said, "Designing a new class of carriers for the Navy is one of the company's most exciting and challenging opportunities.
The CVNX class of aircraft carriers will serve as the Navy's new generation of carriers.
www.nn.northropgrumman.com /news/2000/nr2k0817.html   (327 words)

  
 NDM Article - Navy Starts Work on Next Class of Carriers
But Defense Department officials decided that planned improvements for CVNX 1 were not dramatic enough to justify the expense.
They combined the CVNX 1 and 2 steps “into a single, transformational ship design that accommodates continuous evolution through the life of the class,” Hansford T. Johnson, acting Navy secretary, told the Senate Armed Services Committee.
The result, CVN 21, is providing an opportunity to reexamine “the way that we build and design ships and to set the baseline for the rest of the family of ships” that are in the works, including the littoral combat ship, DD(X) destroyer and Virginia-class submarine, Dwyer said.
www.nationaldefensemagazine.org /issues/2003/May/Navy_Starts.htm   (1950 words)

  
 World Navies Today: US Navy Aircraft Carriers & Surface Combatants
Concept/Program: CVNX is a new carrier design intended to follow the Nimitz class in production.
CVN 77, the final ship of this class, will be a "transition" ship to the new CVNX design, and will differ considerably from the other ships of the class.
Scheduled to be replaced by CVNX 1 in 2013.
www.hazegray.org /worldnav/usa/surface.htm   (4491 words)

  
 CVX - Navy Ships
CVNX—Centerpiece of the New Carrier Fleet by Bob Stephenson and Adrienne Rakotz NAVSEA's Deckplate Jan-Feb 1999 -- CVNX 1, which will replace USS Enterprise (CVN 65) in 2013, is scheduled to begin construction in 2006.
Two contracts awarded for new carrier electromagnetic launch system.
NAVSEA Wire Service 99-32 (December 20, 1999) This phase of the program will consist of the development of a full-scale, reduced-length, fully integrated prototype EMALS, which will replace the current generation of steam catapults in CVNX aircraft carriers.
www.fas.org /man/dod-101/sys/ship/cvx.htm   (1279 words)

  
 [No title]
Subject: Re: CVNX Naming Contest >> Just for the fun of it I think we should run a contest (prize to be determined) on name suggestions for the un named new carrier just authorized.
Subject: CVNX name I vote for USS Midway, Lexington, Antietam (isn't there one already??) or Coral Sea, in that order.
I'd love to see another Enterprise, but I think this one has to be stricken first, and I fear that won't happen in my lifetime due to the EPA issues surrounding a Nuke ship.
smmlonline.com /archives/VOL1188.txt   (1842 words)

  
 Carver wins two multi-million dollar contracts   (Site not responding. Last check: 2007-10-10)
Carver Pump has been awarded a two multi-million dollar contracts by Northrop Grumman Ship Systems, Newport News Operations, for the final design and development of certain pumps relating to the CVNX project.
CVNX represents the U.S. Navy’s next generation of aircraft carriers, and includes technological improvements that will lower operating costs while improving combat capabilities.
CVNX 1, which will replace USS Enterprise (CVN 65) in 2013, is scheduled to begin construction in 2006, with CVNX 2 construction to follow several years later.
impeller.net /magazine/news_en/dx674z.asp   (102 words)

Try your search on: Qwika (all wikis)

Factbites
  About us   |   Why use us?   |   Reviews   |   Press   |   Contact us  
Copyright © 2005-2007 www.factbites.com Usage implies agreement with terms.