| |
| | Transit - Heavy Rail - F.E. Jordan Associates, Inc. (Site not responding. Last check: 2007-10-08) |
 | | The Colma Extension of the Bay Area Rapid Transit System (BARTD) is the f~rst leg of extending BARTD to the Airport. |
 | | F. Jordan Associates, Inc. was the principal sub-contractor to Booz, Allen and Hamilton, Inc., retained by the Southern California Rapid Transit District to perform Systems Engineering and Analysis activities in conjunction with preliminary design efforts for the Metro Rail Starter Line Project. |
 | | Jordan Associates' participation included development of operating criteria and preliminary design specifications for the system's yards and shops, development of a document control plan, participation in the configuration control and alternative activities, and development of a system-wide maintenance plan, which is utilized to project operational and maintenance costs. |
| www.fejordan.com /transit/thrl.html (1630 words) |
|