| | TRMM-LBA - ESPO-Earth Science Project Office (Site not responding. Last check: 2007-10-13) |
 | | The 2-D video disdrometers will require more elaborate set-up, calibration, and maintenance and therefore will likely be deployed at the beginning of the IOP (e.g., first week of January 1999). |
 | | This multi-instrumented (profilers, disdrometers, gauges) ground validation network should provide unprecedented observations of DSD, rainfall rate, and precipitation vertical structure in tropical continental rainfall and will be crucial to achieve improved understanding of the ground radar (both polarimetric and Doppler) and the TRMM satellite measurements. |
 | | The purpose of separating 24 gauges and 10 disdrometers into two separate networks is to maximize the probability of capturing a significant rainfall event on any given day while still allowing the investigation of rainfall spatial variability on small scales. |
| cloud1.arc.nasa.gov /trmmlba/planb.html (1408 words) |