| |
| | CM/CV Ch 10 -- Elliott Bay Marina Inc. |
 | | Elliott Bay Marina was built to exceed environmental standards for habitat creation, pollution control, and water circulation, and it operates with effective clean marina practices for hazardous waste, spill prevention, dog waste, recycling, habitat testing, and educational programs. |
 | | Elliott Bay Marina complies with the marina management measures for habitat assessment, solid waste, and liquid materials, as well as marina flushing, water quality assessment, shoreline stabilization, storm water runoff control, fueling station design, sewage facility, sewage facility maintenance, fish waste, petroleum control, boat cleaning, and public education. |
 | | Elliott Bay Marina is a 4-year-old marina built to exceed environmental standards at considerable cost, but the combination of its newness and very clean operations filled 88% of the slips by 1995. |
| www.p2pays.org /ref/04/03708/text/ch10.html (1932 words) |
|