  Directory of Official Information 2003: Genesis Power Limited
Genesis Power Limited was incorporated on 16 December 1998 and commenced trading on 1April 1999.
Genesis Power Limited is one of three state owned enterprises that took an assignment of various assets and liabilities from ECNZ.
Genesis is primarily concerned with the generation, trading and retail of electricity.
www.justice.govt.nz /pubs/reports/2003/DOI-03-05/list-g/genesis-power-limited.htm   (377 words)

  
 3. Submissions | Genesis Power Limited | Submissions
Genesis submits that affected industry participants should be entitled to request a review of these factors where appropriate in light of the design principles behind the form of the agreements and/or methodology as is provided in relation to review of grid reliability standards and the grid economic test.
To achieve this, and the stated design principles of the Part F Rules, Genesis suggests that consultation with affected industry participants be mandatory and all appropriate areas of Part F and that the Board be required to consider the results and reasoning of such consultation.
Genesis notes that the EC should be careful to consider the interests of end use customers and appropriate outcomes to alleviate the effect of the negotiation power Transpower holds through its monopoly market position.
www.med.govt.nz /templates/MultipageDocumentPage____7883.aspx   (4067 words)

  
 Current Media Statements   (Site not responding. Last check: 2007-10-17)
Genesis' Chief Executive, Murray Jackson, said today that the trout issue had been one of the few technical issues on the TPD that had not previously been resolved via consultation and consensus and the agreement with DOC would now enable both parties to focus on river management.
However Genesis will release several natural freshes down the river each year to assist in flushing sediment and periphyton (algae) from the river bed, and work with DOC to enhance anglers' access and monitor key aspects of the Tongariro River fishery.
Genesis lodged applications in 1999 seeking resource consents to continue to operate the TPD for a further 35 years.
genesispower.co.nz /genesis/index.cfm?60757CB3-50BA-1DC3-6558-E1E13B6D1C92&news_article=0BEB44B1-E018-8BD1-329C-45D27C8E1C20   (310 words)

  
 Genesis Cable Power Limited Circuit Cable - Shielded/Plenum Rated, 1,000' - Genesis Cable 3214 - TWAcomm.com, Inc.
Genesis Cable Power Limited Circuit Cable - Shielded/Plenum Rated, 1,000' - Genesis Cable 3214 - TWAcomm.com, Inc.
Genesis Cable Power Limited Circuit Cable - Shielded/Plenum Rated, 1,000'
Cable for burglar alarms, public address systems, intercoms, telephone stations, speakers, instrumentation, control and other low voltage circuits that are power limited.
www.twacomm.com /catalog/model_3214.htm   (137 words)

  
 NZX: By Company
Genesis Power Limited and New Zealand Oil & Gas Limited (NZOG) today announced they have agreed key commercial terms for Genesis to purchase NZOG's share of gas from the Kupe field and fund up to NZ$40 million of NZOG's Kupe development costs.
Genesis Power, a New Zealand state owned enterprise, is a leading generator and retailer of electricity and gas in New Zealand, with assets valued at NZ$1.2 billion and revenue for the financial year ended 30 June 2003 of NZ$1.4 billion.
Genesis owns seven power stations, including New Zealand's largest thermal plant, Huntly Power Station; and plans to build another major thermal power plant in the near future.
www.nzx.com /market/market_announcements/by_company?id=99926   (435 words)

  
 DAN Divers Alert Network : Sherwood, Genesis BCDs Being Recalled
The power inflator on certain model BCDs could, in rare instances, provide continuous inflation and expose the diver to potential injury if appropriate measures are not taken to operate the exhaust valve to control ascent.
The condition is caused by a molding variation in a seal within inflator valve, and although this variation is not present in every power inflator, we are requiring that all BCDs manufactured within a limited time period be updated with new power inflator valve assemblies.
Buoyancy compensator power inflators with a blue colored power inflator button are not affected by this notice.
www.diversalertnetwork.org /news/article.asp?newsid=366   (315 words)

  
 Genesis Security Cables/Power Limited Circuit Cables - Article 725   (Site not responding. Last check: 2007-10-17)
Class 1, Class 2, and Class 3 remote-control, signaling and power limited circuits that are not an integral part of a device or appliance.
The voltage and power limitations of the source are in accordance with NEC Section 725-21.
Due to its power limitation, a Class 2 circuit considers safety from a fire initiation standpoint and provides acceptable protection from electric shock.
www.bassburglaralarms.com /category_294.htm   (302 words)

  
 New Zealand Overview Archives   (Site not responding. Last check: 2007-10-17)
As previously announced, SENZ entered into a new agreement during the third quarter with Genesis Power for the sale to Genesis of up to 8 petajoules of natural gas (approximately 7.2 billion cubic feet) per year over a three-year period that began July 8, 2003.
As previously announced in May 2001, SENZ and Genesis are also parties to a gas purchase agreement for the delivery to Genesis of up to 40 petajoules (approximately 38 billion cubic feet) of natural gas over a ten-year period.
SENZ acquired the 5% interest held by Bligh’s subsidiary, Marabella Enterprises Limited, in the Swift-operated petroleum exploration permit 38719 along with the 5% interest in the Rimu petroleum mining permit 38151, where the Rimu and Kauri discoveries are located.
www.swiftenergy.com /SFY/Menus/Operations/NZ-Operations/NZ-Overview-Archives.htm   (8803 words)

  
 SWIFT ENERGY ANNOUNCES 10-YEAR GAS CONTRACT IN NEW ZEALAND -- 5-1-01
The contract calls for deliveries of up to four petajoules (3.8 billion cubic feet) per year for ten years to be used by Genesis Power at their Huntly Power Station, New Zealand's largest thermal power station.
Genesis Chief Executive Murray Jackson says the contract with Swift Energy is significant as it further secures the competitive positioning of New Zealand's largest thermal station at Huntly.
State-owned, Genesis Power is an electricity generating, marketing, trading and retailing company that owns seven power stations, including the 1,000-megawatt Huntly Power Station.
www.swiftenergy.com /Sfy/Publications/Press-Releases/2001/R010501.htm   (849 words)

  
 IFLR Guide - Simpson Grierson   (Site not responding. Last check: 2007-10-17)
The Electricity Corporation of New Zealand Limited (ECNZ) was established as an SOE to own and operate all generation and transmission assets.
Genesis Power Limited - allocated Huntly (gas and coal fired) and the Tongariro River power stations (14% of generation),
Mighty River Power Limited - allocated all of the Waikato River hydro-power stations (11% of generation).
www.x-tech.co.nz /IFLR_Guide.html   (3929 words)

  
 Genesis Power Limited | Submissions | Transitional Enforcement of Transpower's Pricing
Genesis is a state-owned enterprise with a diverse electricity generation portfolio and is one of New Zealand's largest energy retailers.
Genesis is currently a member of the New Zealand Electricity Market, a party to the Metering and Reconciliation Information Agreement and a member of the Electricity Complaints Commissioner Scheme.
Genesis' contact would be happy to receive any queries in relation to our submission.
www.med.govt.nz /templates/Page____4267.aspx   (299 words)

  
 New Gibraltar Encyclopedia of Progressive Rock GA-GH
Phillips was also in another band, The Anon, and they joined forces in 1967 for the first incarnation of Genesis (with Gabriel as the flute player, not the vocalist!) It wasn't long before he became the lead vocalist and also the main lyricist for the band.
Though he was the "voice" of Genesis, he never wrote any of the music, though he was responsible for the bulk of the lyrics.
Their first album From Genesis To Revelation (since reissued under many different titles) was a very majestic blending of late sixties British styles, most notable comparisons would be to the early Bee Gees or The Moody Blues, very acoustically driven (piano, acoustic guitar prominent), with Peter Gabriel's unique vocals and thoughtful, often personal lyrics.
www.gepr.net /ga.html   (16101 words)

  
 Solid Energy New Zealand Ltd : Premium Export Coal : Export Coals of New Zealand : New Zealand Coal Mining
Genesis Power Limited, owners of Huntly Power Station, and coal producer, Solid Energy New Zealand Ltd, have today released details of a contract to supply 11 million tonnes (mt) of coal to Huntly Power Station over eight years to 2011.
Solid Energy has already started the work required to ensure it is able to continue supplying Huntly Power Station with up to 2 mtpa, beyond the period of this contract.
The two companies are also working together to substantially increase stockpile capacity at the power station to provide greater flexibility of supply.
www.solidenergy.co.nz /ab-press-details.asp?id=53   (475 words)

  
 GENESIS The Lamb Lies Down On Broadway reviews and MP3
The final album to have Peter Gabriel as an active member of Genesis, he leaves with the proverbial bang and captivates the listener throughout the entirety of Rael's incredible journey of the mind and the depths of New York City.
Genesis were no exception, and it was predictably overblown and overstuffed.
Unfortunately when Genesis performed the Lamb live in 74-75 there was very little video footage (about 10 minutes worth) recorded mainly due to problems that the band would sometimes have with the show (slide synchronization, equipment, etc...).
www.progarchives.com /Progressive_rock_discography_CD.asp?cd_id=1511   (12026 words)

  
 Worldwide | News Detail
Downer Engineering Power, a subsidiary of Australia-based Downer EDI Limited, will take charge of civil work, equipment installation, and manufacturing and procurement of the HRSG and other peripheral equipment.
The Huntly Power Station, New Zealand's largest thermal power plant and is located approximately 100 km south of Auckland.
The station already has four power units in operation, each generating 250 MW and all units are capable of burning coal, natural gas, or a combination of the two.
www.dieselpub.com /ww/news_detail.asp?pick=42   (285 words)

  
 Book of Genesis
Genesis, the first book of the Old Testament in the Bible, is so named because it opens with an account of the creation of the world.
Although Moses has traditionally been considered the author of Genesis, modern scholars generally agree that the book is a composite of at least three different literary strands: J (10th century BC), E (9th century), and P (5th century).
It is generally known among Christians by the name of Genesis, i.e., "creation" or "generation," being the name given to it in the LXX.
mb-soft.com /believe/txs/genesis.htm   (10319 words)

  
 R/C Kits - Genesis
Every aspect of the CEN GENESIS is designed and reinforced to take the punishment of the extremely powerful.46 rear exhaust engine.
The main gears that receive the power from the engine are also hardened steel for long life.
The GENESIS has a sealed Radio compartment that eliminates substances like dirt, dust, water, and oil from coming in contact with your receiver.
www.cenracing.com /cars/genesis/genesis.html   (1164 words)

  
 IHA Newsletter January 2003   (Site not responding. Last check: 2007-10-17)
Recent references in the hydro power industry include the hydro power stations of Etschwerke AG Naturno (Italy), Brennerwerk (Austria), SEO Vianden (Luxemburg), RWE Bernkastel (Germany), Lulea Vattenfall (Sweden), Hydro Energi, Hoyanger (Norway).
Genesis Power Limited is a state-owned enterprise with a diverse range of generating assets.
Genesis operates 1,600MW of generation, including hydro stations at Tongariro and Waikaremoana, New Zealand's largest thermal power station at Huntly, a wind farm in the Wairarapa and co-generation facilities at large industrial sites.
www.hydropower.org /Newsletters/news_jan03/Welcome_corporate.htm   (1548 words)

  
 Genesis Energy e3p OIA Release - 14 October 2004 - Release - The Treasury
Genesis Energy e3p OIA Release - 14 October 2004 - Release - The Treasury
On 12 August 2004, the government announced that it had decided to enter into a risk-sharing agreement with Genesis Energy (Genesis) to facilitate the building of a new 385MW combined cycle gas turbine plant at Huntly, called e3p.
The government facilitated the development by agreeing to share a limited amount of risk with Genesis around the long term supply of gas.
www.treasury.govt.nz /release/e3p   (498 words)

  
 RIGZONE - Genesis Power Ltd.
Monday, May 10, 2004 - Genesis Power Limited and New Zealand Oil & Gas Limited have agreed key commercial terms for Genesis to purchase NZOG's share of gas from the Kupe field and fund up to NZ$40 million of NZOG's Kupe development costs.
Thursday, January 29, 2004 - Origin Energy is in negotiations with Genesis Power for the acquisition of a 50% interest in the Kupe oil and gas field situated offshore Taranaki basin
Friday, May 09, 2003 - Kupe Field partners Genesis Power Ltd and New Zealand Oil & Gas Ltd are commissioning an initial engineering study to refine the preferred development concept of an offshore unmanned facility, with processing of liquids to be carried out onshore.
www.rigzone.com /news/company.asp?comp_id=133   (299 words)

  
 Spill Report   (Site not responding. Last check: 2007-10-17)
Genesis Power Limited (Trading as Genesis Energy) operates two hydro schemes which require mandatory spill reporting:
Genesis Energy uses every endeavour to maximise the generation value of its hydro resources.
There is limited storage capability in the Tongariro scheme.
www.genesisenergy.co.nz /genesis/generation/spill--outage-report/spill--outage-report_home.cfm   (479 words)

  
 Temp Controller and Genesis power Supply
I finished this project just as the Genesis Power Supply and temp regulator kit was made available for purchase.
The backplane connectors are an IEC 120v power jack, power to the Peltier, 15 pin power connector for the Genesis, and RJ-12 connector to the scope control pc, and a bnc jack which provides a 10mV/K temperature sense voltage.
The limiting factor is the gradual increase in sump temperature.
web.qx.net /lhaddix/genps.htm   (728 words)

  
 Design Arguments for the Existence of God [Internet Encyclopedia of Philosophy]
Ever since the creation of the world his eternal power and divine nature, invisible though they are, have been understood and seen through the things he has made.
First, the very point of the argument is to establish the fact that there exists an intelligent agency that has the right causal abilities and motivations to bring the existence of a universe capable of sustaining life.
Second, and more obviously, we do not have any past experience with the genesis of worlds and are hence not in a position to know whether the existence of fine-tuned universes are usually explained by the deliberate agency of some intelligent agency.
www.iep.utm.edu /d/design.htm   (8076 words)

  
 Genesis Power Limited -- Facts, Info, and Encyclopedia article   (Site not responding. Last check: 2007-10-17)
Genesis Power Limited -- Facts, Info, and Encyclopedia article
Genesis Power Limited is a (An independent country within the British Commonwealth; achieved independence from the United Kingdom in 1907; known for sheep and spectacular scenery) New Zealand (additional info and facts about electricity generation) electricity generation and (additional info and facts about electricity retailing) electricity retailing company.
It is the largest combined gas and electricity retailer in New Zealand.
www.absoluteastronomy.com /encyclopedia/g/ge/genesis_power_limited.htm   (109 words)

  
 Geocoding
Genesis Power Ltd’s meter reading is carried out by a company whose meter readers depend on well-defined walkout areas.
This caused problems for Genesis as they couldn’t accurately bill their customers as often as they needed, thus affecting cash flow.
Stage 2 required the identification and separation of Genesis clients into those who use only one type of energy, eg gas or electricity, and those who use dual types of energy, both gas and electricity.
www.terralink.co.nz /case_studies/genesis_case_study.htm   (462 words)

  
 Scoop: Call-In Request for Power Stations Denied
The Environmental Defence Society (EDS) says the government's refusal to use its call-in powers for proposed new power stations indicate it is not prepared to "walk the talk" when it comes to climate change.
The Minister for the Environment, Marian Hobbs, has refused a request from EDS to call-in three proposed new power stations, a procedure under the Resource Management Act (RMA) that would have allowed thorough consideration of the national implications of the proposal.
This is very difficult to do without call-in when the old power stations and the likely locations of offset forests are located across regional council boundaries.
www.scoop.co.nz /stories/PO0105/S00076.htm   (887 words)

  
 Media release for NEWCALL Group Ltd   (Site not responding. Last check: 2007-10-17)
Newcall Group Limited announced today that it has signed an agreement in principle to sell certain assets of its electricity retailing subsidiary, Energy Online Ltd, to Genesis Power Limited for an undisclosed sum.
Genesis' chief executive, Murray Jackson, says Energy Online will retain its separate customer base, its brand name and intellectual property.
Genesis Energy services 450,000 residential electricity customers, 2,200 large commercial and industrial customers and 95,000 gas customers throughout New Zealand.
www.newcall.co.nz /press_30082002.html   (186 words)

Try your search on: Qwika (all wikis)

Factbites
  About us   |   Why use us?   |   Reviews   |   Press   |   Contact us  
Copyright © 2005-2007 www.factbites.com Usage implies agreement with terms.