| |
| | SIP-Assumptions4,LM.doc |
 | | Arborway Restoration Alignment: The <b>Greenb> <b>Lineb> E branch was extended south along S. Huntington Ave., Centre St., and then South St., where it ended at Arborway at a location adjacent to the Orange <b>Lineb>’s Forest Hills Station. |
 | | Enhanced <b>Greenb> <b>Lineb> to West Medford and Union Square Alignment: The alignment for this extension consisted of two branches, both extending from Lechmere, with one going to West Medford and the other going to Union Square in Somerville. |
 | | <b>Greenb> <b>Lineb> to West Medford Alignment: The alignment for this extension started at Lechmere Station and headed northwest, meeting with the Lowell <b>Lineb> just south of Washington St. in Somerville. |
| www.ctps.org /bostonmpo/SIP/SIP-Assumptions4,LM.doc (2527 words) |
|