 | | Construction of Plants #1 and #2 of Incheon Thermal Power Plant began in 1968 on a reclaimed site (2,185,000㎡) between Bamseom Lsland and Mokseom Lsland; Plant #1 was completed on May 29, 1970; Plant #2 was completed on December 20, 1974. |
 | | The capacity of the two plants is 500,000 kW (250,000 kW x 2), the greatest capacity of thermal plants at that time, and they have contributed to the stable supply of electricity to Gyeongin area. |
 | | Plants #3 and #4 (capacity 325,000 kW each) were constructed in May and December of 1978, respectively, to cope with the increased demand in the area. |