| |
| | 4 - The MRT Circle Line |
 | | It will run from Dhoby Ghaut Station in Orchard Road, and will pass through the civic district, some of the busiest corridors in the city, residential towns, industrial developments and R&D institutes before terminating at HarbourFront Station at the southern tip of Singapore. |
 | | 1- Excavation beneath roof slab for Dhoby Ghaut Station, 2- Aerial view of Museum station with traffic diversion on top of excavation, 3- Cut and cover excavation towards Contract 824, 4- Excavation of Top Heading for SCL Overrun tunnel, 5- Preparation for launching of Inner Bound TBM |
 | | Three of the stations are earmarked as future stations, and will not be built at the same time, as the areas around these three designated sites are not fully developed at the moment. |
| www.ita-aites.org /cms/1082.html |
|