Factbites
 Where results make sense
About us   |   Why use us?   |   Reviews   |   PR   |   Contact us  

Topic: High speed quad chairlift


Related Topics

In the News (Mon 28 Dec 09)

  
 Whistler-Blackcomb - Wikipedia, the free encyclopedia
In response to Blackcomb Mountain’s construction of three high-speed quad chairlifts, Whistler Mountain undertook one of the biggest ski lift construction projects ever realized in Canada, the construction of the Whistler Express Gondola.
A year later, in 1991, Whistler Mountain continued in its construction streak, replacing three double chairlifts and the original gondola with two high-speed quad chairlifts, the Quicksilver and Redline lifts, also built by Lift Engineering.
The two high speed quad chairlifts used by the bike park have every second chair replaced with a bike rack during the summer.
www.wikipedia.org /wiki/Whistler-Blackcomb_Resort   (1566 words)

  
 Detachable chairlift - Wikipedia, the free encyclopedia
These grips allow for the cabin to be detached from the moving cable and slowed down in the terminals, to allow passengers to board and disembark.
In this type of chairlift the chairs move at the same speed as a detachable lift's, even through the terminal, and skiers are already moving on a belt of carpet-like material when they meet the chairs.
Their relative, or closing, speed is thus not excessive.
www.wikipedia.org /wiki/High-speed_quad_chairlift   (318 words)

  
 Whistler-Blackcomb -- Facts, Info, and Encyclopedia article   (Site not responding. Last check: 2007-10-29)
Whistler-Blackcomb is a (A resort with lodging and facilities for skiing) ski resort located in (Makes a loud high sound) Whistler, (A province in western Canada) British Columbia which comprises a village with several large hotels, eateries and bars, condominiums, and expensive homes.
A year later, in 1991, Whistler Mountain continued in its construction streak, replacing three double chairlifts and the original gondola with two (additional info and facts about high-speed quad chairlift) high-speed quad chairlifts, the Quicksilver and Redline lifts, also built by (additional info and facts about Lift Engineering) Lift Engineering.
The Wizard and Solar Coaster quad lifts cut the lift ride time from base to alpine from 45 minutes to 15.
www.absoluteastronomy.com /encyclopedia/w/wh/whistler-blackcomb1.htm   (1154 words)

  
 Lake Tahoe Ski Vacations   (Site not responding. Last check: 2007-10-29)
Insider tip: During high seasons in winter and summer, the resort provides complimentary shuttle service to Truckee and throughout the resort.
During summer and winter, a 15-minute cable-car ride to High Camp provides quick access to restaurants, warm-weather swimming, and summer/winter ice skating; also available in summer are hiking, horse riding, golf, mountain biking, and rafting.
In addition, Squaw Valley's two major chairlifts and its gondola (Funitel) are within the surrounding area.
www.ski-vacations.net /lake-tahoe-ski-vacations.htm   (1649 words)

  
 The Steamboat Pilot: Chairlift to be replaced
The old Burgess Creek chairlift has seen more than three decades of service at the Steamboat Ski Area, but the winter of 2003-04 was its last.
The terminals for the triple chairlift will be positioned in about the same locations as the old Burgess Creek lift, but the lower maze will be realigned behind the terminal, eliminating the skier/rider bottleneck that occasionally occurred on Ego trail.
Allen said a high-speed detachable quad chairlift was not considered a good option for Burgess Creek because of its relatively short length.
www.steamboatpilot.com /section/frontpage_lead/storypr/23949   (441 words)

  
 @PLAY mountain_high   (Site not responding. Last check: 2007-10-29)
For the sixth straight year, Mountain High has spent over $1 million on capital improvements.
These include developments at both its resorts such as new terrain park features, a new children's learning center, increased snowmaking, and the relocation of the area's administration offices.
Mountain High consists of two distincty different mountains, East and West, and a wide assortment of lifts and trails.
www.atplay.com /mtnhigh/index.html   (200 words)

  
 Seamless Integration Of Electrical And Mechanical Systems Doubles Runs For Skiers, Makes Snow Automatically, And ...   (Site not responding. Last check: 2007-10-29)
The numbers of runs made possible through the $1.5 million replacement of the existing Hall lift with the Doppelmayr high-speed-detachable quad chairlift increased from 66 to 144 runs per day, and travel time to the top of Cascade’s skiing and snowboarding hill decreased from nine-and-a-half minutes to two-and-a-half.
While these types of lifts adjust cable speed based on average chair loads, replacement of the couplings and/or motors with a VFD provides speed control based on real world loading needs rather than estimated chair loads.
DC drives and motors continue to be a preference among OEMs because of their ability to provide high horsepower, precise torque and extremely constant speed control.
www.abb.com /global/usabb/usabb049.nsf/0/fb0e8a7933edaa5985256a9500528ae9?OpenDocument   (1789 words)

  
 A guide to hitting the region's slopes
If the liquid precipitation the Quad-State area has received this year is any indication, snowsports enthusiasts should have plenty of white precipitation this winter for downhill and cross-country skiing, snowboarding, snowtubing, snowshoeing and sledding.
Student (9 to 21) weekend $17 and $12 weekday; child (5 to 8) $14 on weekends and $10 on weekdays; child (4 and under) free when accompanied by a parent who skis; seniors (70 and older) free.
Lifts: One high-speed quad chairlift, four regular quads, one double, one handle tow surface lift.
www.post-gazette.com /travel/20031109skirates1109trp3.asp   (1586 words)

  
 Panorama Mountain expansion
The fixed-grip quad chairlift will extend almost a kilometre in length from the Schober's Dream area to the summit.
This quad will provide skiers and snowboarders with a quick and comfortable ascent of over 900 metres in just over six minutes and has the capacity to move over 1,000 skiers per hour to the summit.
With these new lifts, skiers and riders will be able to travel from the base area to the summit of the fourth largest vertical in North America in around 20 minutes.
www.powdermag.com /features/news/Panexpan   (515 words)

  
 Copper Mountain Colorado Vacation Information
Colorado's first high-speed detachable six-passenger chairlift - dubbed the "Super Bee" has replaced the former "B" and "B-1" double chairlifts.
Copper's brand new high-speed detachable quad chairlift will be called "The Excelerator." The Excelerator replaces the former "E" lift, servicing intermediate and advanced terrain in the upper center of Copper Mountain.
The new snowmaking system will guarantee top-to-bottom skiing accessed by the new Super Bee high-speed six-person chairlift and the American Eagle/ Excelerator high-speed quad chairlifts.
summitnet.com /copper   (157 words)

  
 Your guide to the region's 17 ski resorts
Lifts: One high-speed quad chairlift, three regular quads, one double, one handle tow surface lift.
Student (high school or college) and seniors (60 and over) weekend $45; weekday $34; junior (7 to 12) weekend $32; weekday $27.
Lifts: Two high-speed quad chairlifts, five triples at Snowshoe; two quads, two triples, one tube tow at Silver Creek.
www.post-gazette.com /magazine/19991107skifacts7.asp   (1330 words)

  
 New High-speed Quad for New York's Belleayre   (Site not responding. Last check: 2007-10-29)
"I'm pleased to say, what's coming next," Bonacic continued, "is a new high speed quad lift which will cut lift ride times by more than 60%." The construction of the lift is expected to commence in April and be completed in October, 2006.
The cost of the chairlift is $2.6 million and installation costs are estimated at an additional $500,000.
The new high speed quad lift will carry skiers to the top of the mountain in five minutes, rather than the current 13 minutes.
www.firsttracksonline.com /news/stories/113061353849453.shtm   (694 words)

  
 berkshire biking quad search results with Scotland.com   (Site not responding. Last check: 2007-10-29)
These search results have been carefully compiled to ensure only the relevant pages and results on berkshire biking quad are shown.
Quad Safari (Popularity:) (Score: 12.34) Quad biking tours through the countryside of Hertfordshire, UK.
Quad Safari - Quad biking tours through the countryside of Hertfordshire...
www.scotland.com /scotland/berkshire-biking-quad.html   (488 words)

  
 Tracks: SolVista   (Site not responding. Last check: 2007-10-29)
To enhance that experience, the resort is now touting the ski area's brand new Leitner high-speed detachable quad chairlift and a new ski-in, ski-out chairlift installed this year.
The new high speed quad lift was first operated in December of 1999.
The new lift replaces the East Mountain's Expedition chairlift and transforms what was once a 16-minute ride into a four-minute ride.
www.grandtracks.com /solvista.htm   (544 words)

  
 High Speed Quad at Attitash to replace Summitt Triple?
Attitash had a permit to install a high speed quad at Attitash, but they couldn't get it done in time and the permit expired.
As for the chairlift, I'd heard rumors for years...one has heard the same thing at Burke since the dinosaurs.
If the quad thing did happen, there would be a chance of DH mountain biking trails there although then again it may be tough to do because the land above the Flying Yankee is actually White Mountain National Forest Land.
www.alpinezone.com /forums/about2777.html   (1624 words)

  
 Boston.com / News / Local / N.H. / 200 stranded on chairlift at ski mountain in N.H.
Boston.com / News / Local / N.H. / 200 stranded on chairlift at ski mountain in N.H. 200 stranded on chairlift at ski mountain in N.H. Boston Globe
Nearly 200 skiers and snowboarders at the Gunstock ski area in Gilford, N.H., were left stranded in the frigid February air for up to three hours yesterday when a mechanical failure forced the high-speed Panorama quad chairlift to shut down in mid-run.
200 stranded on chairlift at ski mountain in N.H. Crews use ropes to evacuate riders
www.boston.com /news/local/new_hampshire/articles/2004/02/16/200_stranded_on_chairlift_at_ski_mountain_in_nh?mode=PF   (322 words)

  
 Skiing, Snowboarding on Vancouver Island   (Site not responding. Last check: 2007-10-29)
he chairlift whips you to a mile above sea level and the breathtaking view of the surrounding mountains and Strait of Georgia.
You pulled into the resort last night, unpacked your gear in the rental condo and marveled at the amount of snow - 23 feet and rising - and at the brand new high speed detachable quad chairlift - THE EAGLE EXPRESS - installed during the summer of 1998.
The lineup moves quick, and soon you are on a second mountain top and ready to take on Fletcher's Challenge, a fl diamond run with moguls galore.
www.vancouverislandabound.com /skiing.htm   (358 words)

  
 LISTS.4
We assume that gondolas and trams routinely cross all kinds of lifts and that surface lifts are routinely crossed by chairs, gondolas, trams, and probably blimps.
In the last update of "crossing lifts" we used the carefully chosen phrase "we couldn’t find evidence of crossing lifts at that ski area" to both dismiss crackpot theories and cases where we didn’t have a trail map to verify.
The new HS Quad next to the gondola at Keystone is not nearly as far along.
www.geocities.com /Yosemite/Gorge/1097/list7.html   (3113 words)

  
 The Timeshare Beat: Vail Announces 'Blue Sky Basin' Expansion to Open This Season
In addition, three of the four new high-speed quad chairlifts planned for the expansion also will open this season.
The first high-speed quad will run from the bottom of Tea Cup Bowl up the ridge between Pete's Bowl and Earl's Bowl providing the main access to terrain in the area.
A third high-speed quad chairlift, the Tea Cup Express, has been built in Tea Cup Bowl to provide better skier circulation to the west wall of China Bowl and access from the bottom of Blue Sky Basin back to the front side of Vail Mountain.
www.thetimesharebeat.com /archives/ts/tsoct9.htm   (1159 words)

  
 [No title]
The high speed, quad chairlift will replace both existing horizon chairlift and the Champagne T-Bar lift, moving skiers and riders almost two kilometres with an express ride time of just over 6 minutes- virtually three times faster.
This quad will provide skiers and snowboarders with a quick and comfortable ascent of over 900 meters in just over 6 minutes and has he capacity to move over 1,000 skiers per hour to the summit.
These new chairlifts represent one of the most exciting new stages in our overall resort development.
www.ifyouski.com /news/newsarticle?ObjectID=6064515   (314 words)

  
 Keystone, CO Lodging Ski Vacation Packages
Situated in the quaint pedestrian village of River run amongst shops andrestaurants, just steps from the gondola and high speed quad chairlift.These Deluxe 2 Bedroom/2 Bath condos for 6 people depict beautiful mountaindecor with the finest amenities which include the lodge's outdoor heatedpool and hot tubs.
Great location, Just steps from the high speed chairlift, ski school and thechildren's center at the Mountain House base of Keystone Resort.
Situated in the quaint pedestrian village of River Run amongst shops,restaurants, and just steps from the gondola and high speed quad chairlift.Expedition Stations' 1 Bedroom/1 Bath condo for 4, and 2 Bedroom/3 bath for8, depict beautiful mountain decor complimented by the finest amenities toinclude an expansive outdoor pool and hot tubs.
sitzmark.reslogic.com /?dest=COSK&producttype=LO   (2048 words)

  
 Untitled Document   (Site not responding. Last check: 2007-10-29)
The Palisades neighborhood is nestled above the Kirkwood Valley just a short glide away from the resorts main high speed quad chairlift and the Village at Kirkwood.
They offer soaring mountain views of the famous Red Cliffs at Kirkwood and are among the last ski in ski out lots available in the Tahoe Region.
A high standard of architectural and landscaping guidelines will insure the Palisades community has the valley’s most exquisite residences and is the perfect location to build your legacy home in the mountains.
www.mykirkwoodhome.com /home.html   (234 words)

  
 Stevens getting another high-speed chairlift   (Site not responding. Last check: 2007-10-29)
That allows the chairs to run up the mountain at high speed, but slow down in the terminals to make it easier for skiers and snowboarders to get on and off.
High-speed quads travel about twice as fast as conventional lifts and are popular because they mean skiers and snowboarders spend more time on the snow.
Foundations for the the new lift's steel towers will be built as the snow melts and exposes the work areas.
seattlepi.nwsource.com /getaways/021998/obok19.html   (534 words)

  
 Top-notch terrain and updated facilities make Crystal Mountain king of Washington's ski areas   (Site not responding. Last check: 2007-10-29)
Since it bought what has always been Washington's best ski area from a group of 900 shareholders in 1997, Michigan-based Boyne USA has lifted Crystal from its status as a shopworn, weakly managed area with great terrain to a slick, modern area with facilities that begin to match the landscape's quality.
Three older chairlifts have been replaced with modern high-speed lifts, two of them the state's only "six-packs" (six-person chairs) and the newest a quad (four-person) that opened this season in the area's beloved Green Valley.
However, the plan is hanging with more uncertainty than a novice skier in a stalled chairlift 60 feet over the snow.
seattlep-i.nwsource.com /getaways/13729_crystal08.shtml   (1837 words)

  
 Beaver Creek Resort :: Lift Towers Installed for New High Speed Quad Chairlift in Beaver Creek Today   (Site not responding. Last check: 2007-10-29)
BEAVER CREEK, Colo., Aug. 5 /PRNewswire/ -- A Chinook double-bladed helicopter installed lift towers for a new high-speed detachable quad chairlift in Beaver Creek this morning.
The lift will replace the triple chairlift in Larkspur Bowl.
The Larkspur Express Lift (#11) is scheduled to open in December 2005.
sev.prnewswire.com /entertainment/20050805/LAF02505082005-1.html   (266 words)

  
 skipressworld » Capital Improvements Underway at Ski New Hampshire
This year the improvements continue with large projects such as a new high-speed quad chairlift, and more subtle ones such as redesigns to rental shops that reduce time spent waiting in line for equipment.
The lift is part of an overall upgrade to the North Peak area including the widening of the Flume Trail, clearing of glades, and the addition of a deck around the Camp III mid-mountain lodge.
The excitement will continue this winter with drainage improvements, all-new chairlift seat padding and a new top to bottom terrain park among the finishing touches to this re-born ski area.
www.skipressworld.com /us/en/daily_news/2004/08/capital_improvements_underway_at_ski_new_hampshire.html?cat=Resorts   (791 words)

  
 Penticton, British Columbia, Canada
Launched in May 1914, the 200-foot long paddle steamer used approximately 17 tons of coal per trip, at a speed of 17 knots, before completing its last commercial run on October 11th, 1936.
Powder fills the gun barrels of twelve steep chutes that lead skiers down from the peak of Beaconsfield Mountain (elevation 7,187 feet/2178 m), reached by the high-speed quad Westbank chairlift.
High above Penticton, along the Ellis Creek Canyon, is the Ellis Ridge Trail.
www.pentictonbritishcolumbia.com   (1961 words)

  
 SKI Magazine ~ Whiteface Mountain Plays "Name That…Chairlift"
Ride the lift, hike or drive to the Whiteface summit for stunning views of the High Peaks Region.
Work crews are currently removing the double and triple chairs that serviced the mountain for many years to make way for a new high-speed detachable quad lift set to open in late November.
It is that new lift, which will bring boarders and skiers to the base of the summit lift in just six minutes, that is the subject of a contest being run by the Whiteface Mountain marketing department.
www.skimag.com /skimag/features/article/0,12795,334360,00.html   (313 words)

  
 skipressworld » Two New Quad Chairs for Panorama
Panorama Mountain Village, B.C. (Ski Press)-The largest lift expansion in Panorama Mountain Village’s history is the next phase of development for this British Columbian resort.
Two, new, state of the art, Doppelmayr quad chairlifts will replace a double chair and two t-bars and get skiers and riders to the top faster than ever.
The high-speed, quad chairlift will replace both the existing Horizon chairlift and the Champagne T-Bar lift, moving skiers and snowboarders almost two kilometres with an express ride time of just over six minutes - almost three times faster.
www.skipressworld.com /ca/en/daily_news/2003/03/two_new_quad_chairs_for_panorama.html?cat=   (382 words)

Try your search on: Qwika (all wikis)

Factbites
  About us   |   Why use us?   |   Reviews   |   Press   |   Contact us  
Copyright © 2005-2007 www.factbites.com Usage implies agreement with terms.