| |
| | Naval Institute Proceedings Magazine: World Navies in Review by A.D. Baker III |
 | | The third submarine of the class, the Weller, was commissioned on 10 July; the fifth, the Sheean, was launched on 1 May, and the sixth and final submarine, the Rankin, is to be launched this May. The Sheean and the fourth submarine, the Dechaineux, are to be given an interim--but expensive--upgrade before entering active service. |
 | | The second and third 2,180-ton Jiangwei-II-class frigates, with the Chinese version of the French Crotale Modulaire point-defense surface-to-air missile system, were to have been completed during 1999, with the fifth to have launched and a sixth building. |
 | | Of the latter class, the Gelibolu (ex-USS Reid [FFG-30]) was transferred on 1 January 1999, the Gökçeada (ex-USS Mahlon S. Tisdale, [FFG-27]) arrived in Turkey on 27 September, and the USS John A. Moore (FFG-19) is to be transferred this year to complete a sextet of the class in Turkish service. |
| www.usni.org /Proceedings/Articles00/PRObaker.htm (6141 words) |
|