| | Legislative Issues - Pipeline Testimony |
 | | Given the hydrostatic test failure of below 125% MOP, the failure on June 10th, the extent of catastrophe that is at issue, and the urbanization that has occurred surrounding the pipe in my district, communities deserve a high level of confidence that can only be achieved through hydrostatic testing. |
 | | But hydrostatic tests are in current use for several lines in the country and are required every 5 years for intrastate pipelines in California that is over ten years old. |
 | | I think there is some point between the 5 year requirement in California, and the 35 years the line has been sitting in the highly corrosive Northwest soil, that hydrostatic tests should be required, particularly in light of the failure of the pipe during the hydrostatic tests in Bellingham. |