Factbites
 Where results make sense
About us   |   Why use us?   |   Reviews   |   PR   |   Contact us  

Topic: Interconnect facility


Related Topics

  
  NIOSH FACE Program: Minnesota Case Report 96MN001 | CDC/NIOSH
Facility 1 is a district heating facility that serves commercial buildings in the downtown area.
Facility 2 is a district heating facility that serves a limited number of other customers in the vicinity of the facility.
When the crew arrived at facility 2 they informed the operator on duty that they were going to "put the interconnect to sleep" which apparently meant they were going to isolate the interconnect line.
www.cdc.gov /niosh/face/stateface/mn/96mn001.html   (1999 words)

  
 PA Bulletin, Doc. No. 06-326a
Interconnection customers seeking to interconnect a small generator facility shall submit an interconnection request to the EDC that owns the electric distribution system to which interconnection is sought.
The interconnection customer shall permit the EDC to install the lockbox in a location that is readily accessible by the EDC and the interconnection customer shall permit the EDC to affix a placard in a location of its choosing that provides clear instructions to EDC operating personnel on access to the isolation device.
When a customer-generator facility is to be connected to 3-phase, 4 wire primary EDC distribution lines, a 3-phase or single phase generator shall be connected line-to-neutral and shall be effectively grounded.
www.pabulletin.com /secure/data/vol36/36-8/326a.html   (5756 words)

  
 RA222 - Telephone Interconnect on Private Mobile Radio Channels
Telephone interconnect facilities may not be used on PMR systems unless certain conditions are met and such a facility has been detailed on the appropriate licence schedule.
All interconnection systems must not use full duplex operation unless the applicant is the sole user of the channel either regionally or nationally.
Applications for new PMR (Standard) licences with interconnect facilities should be forward to the appropriate local RA office or Central Licensing Unit at the Agency's HQ using form RA1.
www.ofcom.org.uk /static/archive/ra/publication/ra_info/ra222.htm   (1669 words)

  
 WASHINGTON STATE REGISTER
The model interconnection agreement may be modified to accommodate terms and conditions specific to individual interconnections, subject to the conditions set forth in these rules.
It is the responsibility of the generating facility to comply with the requirements of all appropriate standards, codes, statutes and authorities to protect its own facilities, personnel, and loads.
For other generating facilities permitted under these standards but not contained within chapter 80.60 RCW, additional insurance, limitations of liability and indemnification may be required by the electrical company.
www1.leg.wa.gov /documents/wsr/2006/03/06-03-126.htm   (3439 words)

  
 [No title]   (Site not responding. Last check: 2007-10-12)
B. (1) Any electric utility and qualifying facility may agree to a rate for any purchase, or terms or conditions relating to any purchase, which differ from the rate or terms or conditions which would otherwise be required by this rule.
(2) The qualifying facility shall be responsible for the design, installation and safe operation of all equipment and facilities on the qualifying facility's side of the point of interconnection and shall be subject to the requirements of all governmental agencies asserting safety jurisdiction and shall comply with all applicable codes, ordinances, rules and regulations thereof.
A. PROCEDURE A proceeding to resolve a dispute between an electric utility, and a qualifying facility arising under this rule may be instituted by either party filing a complaint or a formal complaint with the Commission in accordance with the Rules of Practice and Procedure of the Commission.
www.psc.state.ms.us /regs/29.html   (2614 words)

  
 Interconnect facility - Wikipedia, the free encyclopedia
Interconnect facility: In a communications network, one or more communications links that (a) are used to provide local area communications service among several locations and (b) collectively form a node in the network.
An interconnect facility may include network control and administrative circuits as well as the primary traffic circuits.
An interconnect facility may use any medium available and may be redundant.
en.wikipedia.org /wiki/Interconnect_facility   (129 words)

  
 NEW MEXICO ADMINISTRATIVE CODE   (Site not responding. Last check: 2007-10-12)
Unless otherwise specifically provided for in the standard interconnection agreement in 17 NMAC 10.571.17 [now 17.9.571.17 NMAC], the procedures in 17 NMAC 10.571.10.2 [now Subsection B of 17.9.571.10 NMAC] for standard interconnection agreements and interconnections shall be followed.
Qualifying facilities that meet the requirements of 17 NMAC 10.571.10.2 [now Subsection B of 17.9.571.10 NMAC] shall not be required by a utility to provide a certification from a professional electrical engineer.
A utility shall not require an isolation transformer for interconnection of single phase photovoltaic facilities meeting the requirements of 17 NMAC 10.571.10.2.
www.dsireusa.org /documents/Incentives/NM01R.htm   (2137 words)

  
 17.9.571 NMAC
If either the utility or the customer requests an alternate form of metering or additional metering that is not required to accomplish net metering or is for the convenience of the party, the party requesting the change in metering shall pay for the alternate or additional metering arrangement.
The utility shall provide a blank form of the standard interconnection agreement in the form set out in Section 17 of this rule within ten (10) days of a request for such form.
to disconnect, without notice, the interconnection facilities if Utility reasonably believes a hazardous condition exists and such immediate action is necessary to protect persons, or Utility's facilities, or property of others from damage or interference caused by Customer's facilities, or lack of properly operating protective devices.
www.nmcpr.state.nm.us /nmac/parts/title17/17.009.0571.htm   (2689 words)

  
 Raytheon Company: Products & Services: Advanced Multilayer Interconnect
Advanced Multilayer Interconnect (AMI) provides high-quality thin film, thick film and high-density interconnect products for commercial, military and space applications.
The Advanced Multilayer Interconnect (AMI) facility, located in Dallas, Texas, is ISO 9001 certified and meets MIL-STD-883 requirements for the manufacture of thin film (TFN), thick film, and high density multichip interconnects HMDI.
AMI's high-quality interconnects are manufactured for DC, radio frequency, and microwave frequency products.
www.raytheon.com /products/ami   (114 words)

  
 Interconnecting Large Facilities | PNM
Systems that interconnect by means of an inverter that is UL 1741 compliant meet state and PNM requirements.
An application fee of $50 for qualifying facilities with a design capacity less than 100 kilowatts and $500 for qualifying facilities with a design capacity of 100 kilowatts or greater is required.
If another form of interconnection protection is used, a list of the protective devices associated with the interconnection and the operating procedure is needed.
www.pnm.com /customers/ic_qual_large.htm   (1316 words)

  
 AES Sparrows Point LNG
The overall vaporization capacity of the facility is designed for 1.5 billion cubic feed per day, with provisions to allow future expansion up to 2.25 billion cubic feet per day of the facility storage and vaporization capacity.
At each of the three interconnection points, there will be a metering system for measuring flow to each of the delivery points.
The facility layout has been designed so that the radiant heat from this fire would be contained on our plant site or over the water.
www.aessparrowspointlng.com /sparrowspoint.asp   (5611 words)

  
 Interconnect Services, Inc.
Interconnect Services, Inc. is focused on providing high-speed Internet Access to business, Internet security products, systems integration and technical support to organizations that have information technology support needs.
Interconnect has been awarded national contracts for Internet technology services based on the company's commitment to high-end hardware and software infrastructure and a solid foundation of experience.
Interconnect Services is a privately held US corporation founded in 1995 with headquarters in Corpus Christi, Texas.
www.aeroconnect.net /news/02172000.ASP   (232 words)

  
 Utility Power Cogeneration - ABS Alaskan Alternative Energy
These utilities generally supply power meters that run backwards when the homeowner's system is feeding power into the grid* and run forwards when the homeowner is using utility power, so the meter itself keeps track of the net balance of power used.
If your utility provider is not listed, it is either because we have not yet obtained their interconnection requirements from them, or because they have no official requirements available.
GVEA also requires that "the Facility shall be operated so that variations from acceptable voltage* levels and other service impairing disturbances do not occur." Trace PS and SW series inverters produce utility quality 60Hz true sine-wave power.
www.absak.com /design/intertie.html   (1137 words)

  
 [No title]
The amount of such insurance shall be sufficient to insure against all reasonably foreseeable direct liabilities given the size and nature of the generating equipment being interconnected, the interconnection itself, and the characteristics of the system to which the interconnection is made.
Collectively, Interconnection Facilities include all facilities and equipment between the Small Generating Facility and the Point of Interconnection, including any modification, additions or upgrades that are necessary to physically and electrically interconnect the Small Generating Facility to the Transmission Provider's Transmission System.
Interconnection Request — The Interconnection Customer's request, in accordance with the Tariff, to interconnect a new Small Generating Facility, or to increase the capacity of, or make a Material Modification to the operating characteristics of, an existing Small Generating Facility that is interconnected with the Transmission Provider’s Transmission System.
www.ferc.gov /industries/electric/indus-act/gi/small-gen/agreement.doc   (6217 words)

  
 RA-WSB
The relocation of Cox’s four radio stations into the new facility also required specific design criteria to meet their needs for cutting-edge technology in the digital radio industry, such as stringent acoustic standards in the radio studios and uniquely designed ductwork.
During the move operation, an interconnect room was developed with 16 four-inch conduits that traverse underground from the old building to the new facility.
The entire television facility is connected by 16 broadcast service panels that facilitate all functions for news and production within the broadcast plant, separating signals for clean operation by distributing them via separate metal conduits.
www.theaustin.com /html/ra-wsb.html   (2947 words)

  
 Method, apparatus and system for acquiring a plurality of global promotion facilities through execution of an ...   (Site not responding. Last check: 2007-10-12)
Although illustrated as a facility within system memory, those skilled in the art will appreciate that global promotion facility 32 may alternatively be implemented within a system or bus controller, bus bridge, response logic, or other component of data processing system 8.
System interconnect 12, which can comprise one or more buses, a switch fabric, or other interconnect architecture, serves as a conduit for communication among the devices (e.g., processing units 10, memory controller 24, etc.) coupled to system interconnect 12.
An entry within promotion awareness facility 99 for a particular processing unit 10 is also updated to a new value in response to snooping a request by the particular processor 10 for a different promotion bit 36.
www.freepatentsonline.com /6842847.html   (7897 words)

  
 Interconnecting Non-Qualifying Facilities | PNM
Although PNM is not required to interconnect with non-qualifying facilities, it has chosen to do so using the same simple process that is used for qualifying facilities.
PNM will authorize the interconnection of any non-qualifying generating system that complies with the conditions of interconnection in New Mexico Public Regulation Rule 17.9.570 and with PNM's Interconnection and Safety Standards.
An application fee of $50 for facilities with a design capacity less than 100 kW kilowatts and $500 for facilities with a design capacity of 100 kilowatts or greater is required.
www.pnm.com /customers/ic_qual_non.htm   (1395 words)

  
 EPA: Federal Register: Construction and Operation of the Proposed Wellton-Mohawk Generating Facility, Yuma County, AZ
Associated with the Facility would be a solar component that would convert solar energy to thermal energy for inlet air-cooling.
Natural gas for the Facility would be delivered via a new natural gas pipeline that would interconnect to a proposed or existing natural gas transmission line [[Page 27057]] near U.S. Highway 95, northwest of the Facility.
Because the facility would be a major new source of generation and electricity generated by the Facility would be integrated into Western's transmission system, Western has determined that an EIS is required in accordance with DOE's NEPA Implementing Procedures, 10 CFR part 1021, Subpart D, Appendix D, class of action D6.
www.epa.gov /fedrgstr/EPA-IMPACT/2003/May/Day-19/i12435.htm   (1290 words)

  
 Contact HEI
We have manufacturing facilities in Minnesota, Colorado and Arizona.
Our Microelectronic Operations facility in Minnesota is ISO 9001:2000-certified with two Class 10,000 Clean Rooms and provides microelectronic solutions to leading electronic and medical device manufacturers.
This facility is FDA-registered, ISO 13485:2003-certified and UL, CSA and ETL compliant.
www.heii.com /contact.htm   (101 words)

  
 Distributed Generation (Rule 21 Retail Generators)
The generation facilities must be certified to operate in parallel with the electric system grid—i.e., not back-up generation—and must meet other criteria established by the CPUC.
The Rule 21 interconnection application (Form 79-974) must also be used to address the physical and contractual aspects of interconnection.
If the generation facility operates on natural gas delivered by Pacific Gas and Electric Company, an Application for Gas Service must be submitted to the local PG&E Service Planning Department for processing in accordance with Gas Rule(s) 15/16.
www.pge.com /suppliers_purchasing/new_generator/retail_generators   (1755 words)

  
 Maple Ridge Wind Farm: Facility   (Site not responding. Last check: 2007-10-12)
The interconnect facility connects the Transmission Facility to the NMPC 230 KV Adirondack-Porter Transmission Line, located east of the NYPA 765 KV Line.
The Transmission Facility is comprised of 77 tower structures and a three-phase, single circuit 230 kV line to transmit power from the Rector Road Substation to the Chases Lake Road Interconnect Facility.
Tower structure types were selected to minimize visual impacts of the facility and to further reduce impacts to agricultural areas and other sensitive resources in the study area.
www.mapleridgewind.com /profac.htm   (517 words)

  
 Long-Haul Transmission Systems
Technical control facilities are typically equipped with primary and auxiliary (generator and battery float system) power systems and a power distribution system to accommodate its technical and non-technical requirements.
The TCS serving as the system interconnect point will be capable of providing the proper physical and electrical conditioning to ensure proper interface among the various systems to be serviced.
All TCS facilities must employ distribution facilities as the means to terminate and distribute all outside plant and in-house tie-cables, units and strings of conditioning equipment, and internal operating equipment.
www.fas.org /spp/military/docops/army/lhaul/Lhfinweb.htm   (11775 words)

  
 Introduced Version, House Bill 1225
The commission shall adopt the rules required by this subsection in the same manner as emergency rules are adopted under IC 4-22-2-37.1.
(2) Allow a net metering customer to interconnect a generating facility with a nameplate capacity of five (5) megawatts or less to a distribution facility of an electric utility.
(c) Not later than June 1, 2006, the commission shall evaluate the net metering and interconnection rules adopted by the commission and codified at 170 IAC 4-4.2 for compliance with the requirements set forth in subsection (b).
www.in.gov /legislative/bills/2006/IN/IN1225.1.html   (603 words)

  
 City of Brownfield - Departments
All of the city's generating facilities are designed to operate on either natural gas or #2 fuel oil.
In 1977 the city completed an interconnect facility to purchase a portion of its electrical needs from Southwestern Public Service Company.
The interconnect, as presently equipped, has the capability of handling 22.5 megawatts of power.
www.ci.brownfield.tx.us /electric.php   (586 words)

  
 Tyco Electronics / Local Precision Interconnect Employment Opportunities
We refuse to be satisfied with anything less than the best.  We are the world's leading producer of Electronic Interconnect Systems for medical OEM customers.  Ours is a dynamic work environment where you can squeeze every bit of potential and possibility out of your career.
We are known by our customers for exceptional quality, innovation and responsiveness.  Our products demand density, flexibility and signal integrity previously thought impossible.  We are a place where our employees feel that they can make a difference.
For information regarding open positions at All of Tyco Electronics including the Precision Interconnect facility, please visit http://jobsearch.tycoelec.newjobs.com.
www.precisionint.com /Employment   (199 words)

  
 SRP: Managing water through the drought
In 1990, SRP completed an interconnect facility with the Central Arizona Project (CAP) canal system, making Colorado River water a viable supplement to the greater Phoenix area's water supply.
At the Granite Reef Underground Storage Project (GRUSP) in the Salt River bed, SRP, Phoenix-area cities, the Salt River Pima-Maricopa Indian Community and the Water Banking Authority have "banked" more than 200 billion gallons of CAP water since 1994.
SRP is also investing in the New River-Agua Fria River Underground Storage Project (NAUSP), a new water banking facility.
www.srpnet.com /water/droughtmanage.aspx   (845 words)

  
 Network Control Centers   (Site not responding. Last check: 2007-10-12)
The facility houses equipment to monitor, control and restore the ATandT Switched and Facility networks west of the Mississippi River.
The facility was kept continuously operational by utilizing the existing electrical distribution and standby generator.
KDC designed a creative load shedding system that allowed nonessential load to be dropped during a power outage, with monitoring devices to add the loads back to system in a prioritized manner.
www.kdcarchitects.com /Network_Control_Centers.htm   (1185 words)

Try your search on: Qwika (all wikis)

Factbites
  About us   |   Why use us?   |   Reviews   |   Press   |   Contact us  
Copyright © 2005-2007 www.factbites.com Usage implies agreement with terms.