| | Chapter 2 - Table 5. Mitigation measures required for all action alternatives |
 | | KCEC BLM FS Structures and access roads will be placed so as to avoid to the degree possible features such as, but not limited to, intermittent watercourses, residential uses, cultural sites and/or allow conductors to clear or span the features, within limits of standard structure design. |
 | | KCEC will be responsible for implementation of erosion control measures such as water bars, drainage contours, straw bales, filter cloth or similar tools. |
 | | KCEC FS Clearing of trees for construction purposes will be prohibited from April 1 to August 1. |