| |
| | Articles - Lechmere (MBTA station) |
 | | Due to schedule problems caused by delays on the surface propagating into the subway, a new prepayment station opened on July 10, 1922, and the existing loop was built to turn subway cars, while surface cars also looped on a separate track. |
 | | At the Lechmere end, there was no station, but track connections to existing streetcar lines on Cambridge Street and Bridge Street (now O'Brien Highway), which had continued downtown via the Charles River Dam Bridge. |
 | | July 25, 1986, additional shuttle service ran between Lechmere and Kenmore. |
| www.x-moto.net /articles/Lechmere_(MBTA_station) |
|