| |
| | Road, DIER - Transport Division , Tasmania (Site not responding. Last check: 2007-10-29) |
 | | Kerbs, kerb and gutters, V-gutters, edge strips and crossing shall be constructed in bays not exceeding 3 metres length. |
 | | Kerbs, combination kerb and gutters, V-gutters and edge strips may be constructed using an extrusion machine capable of being fitted with appropriate moulds which produce the profile required. |
 | | The rate for construction of kerbs, kerb and gutter, gutter crossings and kerb ramps within the existing pavement shall include the cost of excavation, supply, placing and compaction of pavement subbase and base, supply and placing of formwork where required, supply and placing of concrete, concrete finishing and curing and disposal of surplus excavated material. |
| www.transport.tas.gov.au /road/tenders/web_spec/road_specs/r36_kerb_604.html (1855 words) |
|