| |
| | Proplanner: MPM |
 | | In addition, new, or modified, product launch times have been reduced by 25 to 50% primarily because of the instant information availability and the benefits of editing existing similar processes instead of re-engineering from scratch as is often done. |
 | | With product design cycle times being shortened from years to weeks and months, and with production batch sizes being reduced to as low as lots of one, the production worker is needing more information, more quickly, in a manner that is easy to access and maintain. |
 | | As the Industrial and Manufacturing engineer develops the integration of the products, processes, resources, and locations these work instructions are electronically associated and compiled to create work instructions that can be distributed about a product produced in many locations, or distributed about all products and processes produced at a location. |
| www.proplanner.com /company/mpm.aspx (2560 words) |
|