| |
| | Bridges |
 | | Pre-stressed concrete bridge with 11 spans and a total length of 450 m, 8 spans built by continuous shoring method, 3 spans built by balanced cantilevering method. |
 | | Pre-stressed concrete construction with a total length of 950 m. |
 | | The cross section is a composite construction (steel + concrete) with 12 spans, total length 901 m. |
| www.tdv.at /wse/a2/b5/c1/bridges.htm (426 words) |
|