 | | Engineering decisions regarding design alternatives and the technical program shall reflect consideration of system cost effectiveness analysis based on the specified figure(s) of merit, performance parameters, program schedule, resource constraints, producibility, and life cycle cost factors. |
 | | The integration and co-ordination of the program efforts for the engineering specialty areas, to achieve a best mix of the technical/performance values incorporated in the contract, shall be described in the SEMP with the detailed specialty program plans being summarized or referenced, as appropriate. |
 | | Thus, the integration of ILS concepts and planning considerations into the system engineering process is a continual and iterative activity, with the output being the optimal balance between performance and support considerations and optimal trade-offs among costs of ownership, schedule, and system effectiveness. |
| home.btconnect.com /managingstandard/499a.htm (4728 words) |
|