| |
| | The San Antonio Area Freeway System - Tollway System |
 | | This type of tollway is currently proposed for US 281 North, SH 151 outside 1604, parts of Loop 1604 East and West, and the middle section of the Wurzbach Parkway. |
 | | Tolled interchanges are currently proposed for Loop 1604 and US 281 North and I-10 West, as well as at US 281 and Wurzbach Parkway. |
 | | Despite the brouhaha, construction contracts for the Loop 1604 toll lane projects, including the interchanges at I-10 and US 281, are tentatively set to be awarded in FY 2006, and ARMA has begun in-depth study on the possible toll projects on I-35 North, Bandera Road, and Wurzbach Parkway. |
| home.att.net /~texhwyman/tollsys.htm (1138 words) |
|