| |
| | M60 motorway at AllExperts |
 | | The M60 was developed by connecting and consolidating the existing motorway sections of the M63, M62, and an extended M66. |
 | | In 2004, a section of the northern M60 was the UK's busiest stretch of road, with an average of 181,000 vehicles per day using the stretch between junctions 16 and 17, although usually, the western side of the M25 motorway holds that honour. |
 | | As part of the project, the A6144(M) motorway, which connected to the M60 at junction 8, was downgraded and lost its motorway status. |
| en.allexperts.com /e/m/m/m60_motorway.htm (537 words) |
|