| |
| | Innovation Grand Prix (Site not responding. Last check: 2007-09-15) |
 | | The building of the motorway from the capital to Kiskunfélegyháza in the southeast of Hungary (110 kilometres) began in March 1996, and was completed in June 1998. |
 | | The motorway tolls introduced on the newly built concession motorways were, for the most part, too high for Hungarian drivers, but were high by international standards too. |
 | | In the end, the National Motorway Rt., which is responsible for motorway-building schemes, handed over the renovated, two-lane, 90-kilometre section of the M7 motorway from Budapest to Lake Balaton at the end of 2001. |
| home.btconnect.com /hungarytrade/itd2/motorway.htm (1066 words) |
|