| |
| | Poggemeyer Design Group |
 | | Within this project scope was a water treatment facility, two 500,000 gallon clearwells, 100 miles of distribution lines, and a 300,000-gallon water storage tank. |
 | | After a pilot study, the plant was designed to incorporate two 10-ft. diameter.565 mgd Culligan Multi-Tech carbon filtration units (expandable to four units) and one existing 8-ft. diameter.360 mgd filtration unit from the pilot study. |
 | | The project also included raw water booster pumps, chemical feed equipment (alum, caustic soda, chlorine, polymer and fluoride), a 60x125 ft. pre-engineered wood frame building addition, and construction of a new chemical and bacteria laboratory. |
| www.poggemeyer.com /Environ/Proj_Profiles.htm (639 words) |
|