| |
| | Engineering Case Study (Site not responding. Last check: 2007-11-05) |
 | | Designing an optimum heating-cooling scheme for the new Molson Centre in Montreal, Canada certainly had some very interesting diversity and load profiles to consider. |
 | | In the case of the Molson Centre, five chillers were used, each with its own primary pump. |
 | | In the case of the Molson Centre, it was calculated, based on five cents per kilowatt-hour (5c/kW hr), that approximately $18,000 per year of operating cost savings could be realized by running three, staged, equal-sized, variable speed pumps in parallel. |
| www.bellgossett.com /Press/molson.htm (1196 words) |
|