 | | Nam Cheong Station, on the West Rail Project, was a project that involves both above and below ground structures, with very challenging site constraints. |
 | | Procured as one of a number of station contracts on the West Rail Line, work on the HK$2.2b (NZ$600m) Nam Cheong Station and Tunnels commenced on site in November 1999. |
 | | The final station will have a concourse slab at basement level, constructed either side of the Airport Express Line (AEL), the east and west boxes, with tunnel links beneath the AEL linking the two halves of the concourse together. |