| |
| | NCDOT Board Transportation, Minutes, October 9, 2003 |
 | | Grading, drainage, paving and structure at bridge over Bear Creek and approaches on SR 1009, with the right of way as indicated upon the final plans for said project, the same being identified as Addendum 9 of the minutes of the October 9, 2003 Board of Transportation meeting and incorporated herein by reference. |
 | | Grading, drainage, paving and structure at bridge over Perry Creek and approaches on SR 2006, with the right of way as indicated upon the final plans for said project, the same being identified as Addendum 4 of the minutes of the October 9, 2003 Board of Transportation meeting and incorporated herein by reference. |
 | | Grading, drainage, paving and structure at bridge over Chockoyotte Creek and approaches on SR 1426, with the right of way as indicated upon the final plans for said project, the same being identified as Addendum 2 of the minutes of the October 9, 2003 Board of Transportation meeting and incorporated herein by reference. |
| www.ncdot.org /board/minutes/years/03/Oct/r3_FinalROW_Plans_1003.html (803 words) |
|