| | JPT (Oct 2005): Special Focus - Ormen Lange: A Resourceful Industry Lands the Serpent (Site not responding. Last check: 2007-10-25) |
 | | Beyond these challenges, Ormen Lange is seen from Hydro’s vantage point as three concurrent projects—development of the reservoir with templates and pipelines to shore, design/construction of the Langeled pipelines (one with 42-in.-diameter and another with 44-in.-diameter pipe), and construction and operation of a processing plant. |
 | | For the Ormen Lange gas-export pipeline, several dozens of alternative routes were studied in detail in an effort to avoid excessively long free spans along the pipeline routes. |
 | | As the project slogan implies, Ormen Lange and the Langeled pipeline are definitely “going further.” From the looks of progress made at the halfway point for construction/installation, this is one fishing tale that will turn out to be true. |
| www.spe.org /spe/jpt/jsp/jptmonthlysection/0,2440,1104_11038_4371907_4387195,00.html (3953 words) |