| |
| | Project 25 (Site not responding. Last check: ) |
 | | P25 is applicable to land mobiel radio (LMR) equipment authorized or licensed, in the U.S., under the National Telecommunications and Information Administration (NTIA) or Federal Communications Commission (FCC) rules and regulations. |
 | | However, use of such equipment is not limited to public safety, and P25 equipment has also been selected and deployed in other private system applications, for example, to serve the needs for a high-quality, secure digital radio system for a railroad system, including rolling stock, personnel and transportation vehicles. |
 | | P25 Phase II implementation involves time and frequency modulation schemes (e.g., TDMA and FDMA), with the goal of improved spectrum utilization. |
| www.tiaonline.org /standards/technology/project_25 (1037 words) |
|