In the News (Mon 28 Dec 09)

  
  MEHEDINTI County   (Site not responding. Last check: 2007-10-14)
The major urban localities in the county are: the municipality of Drobeta — Turnu Severin and the towns of Orsova, Vanju Mare, Strehaia and Baia de Arama.
At Portile de Fier, at the former Cazanele Dunarii Straits — a real challenge to navigators —, the Danube waters were harnessed by the construction of two large dams connecting Romania to Yugoslavia.
Another two huge storage lakes were built at Portile de Fier I and Portile de Fier II (236 sq.km and 67 sq.km, respectively) that add to the hydropower system.
www.clubromania.ro /romania/counties/mehed   (912 words)

  
 Boroneant   (Site not responding. Last check: 2007-10-14)
Recentele discutii din cadrul Comisiei Romano-Iugoslave privind cercetarile arheologice din zona Portilor de Fier ale Dunarii au readus in atentie problema prezentei dacilor in zona inainte de cucerirea romana.
Dispersarea pieselor din tezaurul de la Portile de Fier si lipsa unor descoperiri asemenatoare, cum este cea de la Peretu a facut ca aceasta realitate iconografica istorica sa scape cercetatorilor arheologi si ai istoriei artelor antice din zona si din aceasta parte a lumii vechi in general.
Prezenta pieselor din tezaurul de la Portile de Fier in trei mari muzee ale lumii (New York, Detroit, Drobeta Turnu Severin) si trecerea lor prin colectiile muzeeale din Viena au trezit interesul specialistilor privind tezaurele dacice in special reprezentate de coifuri si alte obiecte din metale pretioase specifice lumii geto-dace.
www.iatp.md /dava/Dava2/Boroneant/boroneant.html   (776 words)

  
 predoiu   (Site not responding. Last check: 2007-10-14)
Cetatea, construita de austrieri intre 1670-1700, a fost stramutata in aval de hidrocentrala, pe insula Simian, inainte de inundare.
trupele romane spre inima Daciei, pe drumul taiat in stanca pe malul drept, atestat de "Tabula Traiana", calcand prin localitatile locuite de daci inca din stravechime.
XIV si cetatea de piatra a lui Mircea cel Batran, stapan al Banatului de Severin, pentru a apara granita de pe Dunare.
www.iatp.md /dava/Dava3/predoiu/predoiu.html   (2684 words)

  
 ROMANIA: Gov't Clarifies Portile de Fier Revamp Contract | seeurope.net   (Site not responding. Last check: 2007-10-14)
The contract on the revamping of the Portile de Fier 1 hydropower plant was signed in 1997, under a Government Resolution, and not by then-Minister of Industries Calin Popescu Tariceanu, and the agreement was signed in favourable terms for the Romanian State, the Government explained, Nine o' clock reports.
The contract was signed further to tender analysis by a commission established under a decision by the Board of Directors of RENEL (the former public electricity corporation, editor’s note) in compliance with all legal provisions, and the funding was entirely covered by Sulzer Hydro/ABB.
Basescu accused Tariceanu that it was during his term in office as a Minister of Industries in 1997 that a contract was signed for the revamping of Portile de Fier hydropower facility with Va Tech (former Sulzer).
www.seeurope.net /?q=node/5876   (256 words)

  
 ZIUA pe Internet   (Site not responding. Last check: 2007-10-14)
Portile de Fier II pot sa devina oras
Finalizarea, dupa mai bine de 20 de ani, a lucrarilor de constructie a sistemului hidroenergetic si de navigatie de la Portile de Fier II a dat nastere unui adevarat orasel care isi cere drepturile teritorial-administrative, informeaza A.M. Press.
In prezent, Portile de Fier II, care nu are statutul unei localitati prpriu-zise, se afla pe insula Ostrovul Mare, langa hidrocentrala romano-iugoslava.
www.ziua.net /prt.php?id=19050&data=1999-01-13&ziua=1d3fdcd24fa5da6decdc3f70b41b1887   (130 words)

  
 Cronica Romana - Cotidian National de Informatie si Atitudine - Editia On-Line :: Portile de Fier functioneaza la ...
Hidrocentralele Portile de Fier I si II, functioneaza la capacitate, in pofida secetei instalate in Europa Centrala, care a generat scaderea debitului Dunarii.
In conditiile unui debit hidrologic normal de 5.520 mc/sec, la Portile de Fier I se produce 5.120.000 MWh, iar la Portile de Fier II 540 MW.
Cele 4 hidroagregate retehnologizate aflate in functiune la Portile de Fier I produc fiecare 195 MW, iar la Portile de Fier II puterea instalata-hidroagregat nu a scazut sub cifra planificata’’, a declarat directorul Centrului Hidroelectrice ‘’Portile de Fier’’, Cristian Cazanachi.
www.cronicaromana.ro /portile-de-fier-functioneaza-la-capacitate-normala.html   (185 words)

  
 I.S.C.E - Institutul de Studii si Consultanta Energetica   (Site not responding. Last check: 2007-10-14)
Realizarea retelelor de triangulatie si nivelment de sprijin la amenajarile hidroenergetice de mare importanta din România, cum ar fi cele de la Portile de Fier I si II, Arges, Sebes, Lotru, Olt Mijlociu, s.a.
Studii de analiza a modului de materializare a retelelor geodezice de urmarirea comportarii constructiilor din administrarea Companiei Nationale de Electricitate — CONEL.
De asemenea, specialistii topo-geodezi dispun de tehnica de calcul de calitate si de programe de prelucrare a datelor de teren performante, de cel mai înalt nivel, pe care le utilizeaza în mod curent pentru rezolvarea problemelor de specialitate.
www.isce.ro /p04_6.html   (503 words)

  
 MEHEDINTI County   (Site not responding. Last check: 2007-10-14)
The major urban localities in the county are: the municipality of Drobeta — Turnu Severin and the towns of Orsova, Vanju Mare, Strehaia and Baia de Arama.
At Portile de Fier, at the former Cazanele Dunarii Straits — a real challenge to navigators —, the Danube waters were harnessed by the construction of two large dams connecting Romania to Yugoslavia.
Another two huge storage lakes were built at Portile de Fier I and Portile de Fier II (236 sq.km and 67 sq.km, respectively) that add to the hydropower system.
clubromania.ro /romania/counties/mehed   (912 words)

  
 SenterNovem - Carboncredits.nl
The aim of the project is to increase the capacity of each unit from 175 MW to 194.5 MW by refurbishing the turbine, the generator and the electrical excitation system.
Portile de Fier I is the largest hydropower dam in Romania (and in Europe).
Hidroelectrica obtained the Environmental Agreement for the upgrading and refurbishment of six hydro units within the company Portile de Fier I. The agreement was issued by the local Environmental Protection Inspectorate and it represents a guaranty that the project will be developed in compliance with the applicable Romanian regulations.
www.senternovem.nl /carboncredits/contracted_projects/eru0101.asp   (675 words)

  
 SenterNovem - Carboncredits.nl
The scope of the modernization is to increase the economic efficiency of the hydropower plant by improving its reliability, by raising the power reserve and the output of the plant, thus meeting the conditions required for aligning and including it into the ancillary service category.
The Hydropower and Navigation System (SHEN) of Porile de Fier II was taken into operation between 1984 and 1986 and was built on the river Danube by Romania and by Yugoslavia under the 1977 Agreement.
The total emission reduction as a result of Portile de Fier II project implementation is calculated by deducting the project emissions from the baseline emissions.
www.senternovem.nl /carboncredits/contracted_projects/eru0317.asp   (514 words)

  
 PORTILE DE FIER   (Site not responding. Last check: 2007-10-14)
Inainte de construirea barajului, care a ridicat cu 32m nivelul lacului de acumulare, in acest sector, cu multe praguri, stinci emerse, viltori si repezisuri, navigatia se facea in conditii grele (trecerea defileului dura 120 ore) si era posibila numai pe timpul zilei.
Aici, s-a construit intre 1964 si 1971, in colaborare cu Iugoslavia, nodul hidroenergetic si de navigatie "Portile de Fier", care cuprinde o hidrocentrala cu puterea instalata de peste 2200 MW si o productie anuala de peste 11 mild kWh.
Dupa construirea celui de-al doilea nod hidroenergetic si de navigatie in aval la peste 50 km, la Gogosu, acest baraj s-a numit Portile de Fier I, iar cel de-al doilea Portile de Fier II, chiar daca denumirea nu este nici geografica si nici prin semnificatie indreptatita.
www.acbotu.3x.ro /orsova/portile_de_fier.htm   (296 words)

  
 Romania: Places: River Danube   (Site not responding. Last check: 2007-10-14)
The work on Portile de Fier I (Iron Gates I) Hydroelectric Power Station and Navigation System started on 7th September 1964 and was finished on 1st May 1972.
Simultaneously with these activities common documents were drawn up with the Yugoslavian beneficiary in order to build a second system: Portile de Fier II (the Iron Gates II) Hydroelectric Power Station and Navigation System with an installed power of 216 MW, for each part.
The fitting out of the Portile de Fier (Iron Gates) hydro-energetic power station and navigation system determined new trends in the rhythm and the manifestation of geomorphologic processes, with consequences on the quality of land and aquatic ecosystems.
www.virtualmontana.org /virtualmontana/romania/places/danube2.htm   (551 words)

  
 Tone de peste mort pe Dunare   (Site not responding. Last check: 2007-10-14)
Zeci de tone de pesti au murit ieri, in Dunare, in dreptul localitatii Hinova, din judetul Mehedinti, din cauza scaderii bruste a debitului apelor, provocata de o manevra gresita a specialistilor de la Hidrocentrala Portile de Fier I. “In data de 17.08.2004, datorita unor lucrari la hidroagregatul nr.
2 de la Sistemul Hidroenergetic si de Navigatie Portile de Fier, aflat in proces de retehnologizare, de comun acord cu parte sirba s-a coborit nivelul in lacul de acumulare PF II sub cota minima normala de exploatare”, se specifica intr-un comunicat semnat de directorul general al Hidroelectrica Mehedinti, Teodor Pavelescu.
Astfel, pe o raza de 5 km se puteau zari mii de pesti, spre bucuria localnicilor care s-au apucat sa-i stringa in saci.
www.evenimentulzilei.ro /social/?news_id=164065&print=1   (121 words)

  
 Amos News Romanian Independent Press Agency   (Site not responding. Last check: 2007-10-14)
Daunele pe care compania VA Tech trebuie sa le plateasca Hidroelectrica pentru oprirea grupurilor retehnologizate de la Portile de Fier I in urma unor defectiuni se ridica la peste trei milioane de dolari, a declarat ministrul Economiei si Comertului, Codrut Seres.
Complexul hidroenergetic Portile de Fier este cea mai importanta unitate a companiei Hidroelectrica, unul dintre principalii producatori de electricitate la nivel national.
La Portile de Fier I lucrarile au inceput in 1997, finalizarea fiind preconizata pentru luna august a acestui an, puterea instalata pe fiecare grup urmand sa creasca de la 174 MW la 200 MW.
www.informatia.ro /PrintArticle91544.phtml   (199 words)

  
 Hidrocentrala Portile de Fier I a fost la un pas de dezastru Companii Economie HotNews.ro - revista presei, stiri, ...
Lucrarile de retehnologizare de la Centrala hidroelectrica Portile de Fier I au dus la descoperirea unor defectiuni majore la turnarea unei piese instalate in urma cu 30 de ani, care ar fi putut cauza, in orice moment, un grav accident ecologic pe Dunare.
De asemenea, defectiunea putea duce la intreruperea functionarii hidroagregatului pe o perioada indelungata, situatie ce ar fi generat costuri importante si mari pierderi energetice.
Prin Portile de Fier I si Portile de Fier II se asigura 41% din energia produsa in unitatile Hidroelectrica.
www.hotnews.ro /articol_5398-Hidrocentrala-Portile-de-Fier-I-a-fost-la-un-pas-de-dezastru.htm   (385 words)

  
 O scurta prezentare a judetului Mehedinti   (Site not responding. Last check: 2007-10-14)
ale judetului sunt: Municipiul resedinta de judet Drobeta Turnu Severin, orasele Orsova, Vanju Mare, Strehaia si Baia de Arama.
Judetul are si 59 comune si 344 sate.
Manastirea Vodita (reconstruita), cea mai veche asezare monastica in provincia Oltenia construita intre 1370-1372 de catre Voievodul Vlaicu Basarab, se gaseste la 20 km de Drobeta Turnu-Severin in drum spre valea Vodita.
www.cjmehedinti.ro /mehedinti-ro.html   (868 words)

  
 Picture Gallery - Directory: /pix/ro/misc/tunnel   (Site not responding. Last check: 2007-10-14)
Tunel (unul din cele 14) de pe Magistrala 900 Bucuresti-Timisoara, situat pe linia ce urmareste Defileul Dunarii de la Portile de Fier (la aproximativ aceeasi altitudine: 300m), putin deasupra nivelului apei lacului de acumulare.
Linia a fost reconstruita in periada 1960-1975, odata cu constructia barajului (Sistemului Hidroenergetic si de Navigatie) de la Portile de Fier, cand a fost ridicata cu ~30m, necesitandu-se constructia a mai multor tunele si ziduri de consolidare, precum si luarea unor masuri de aparare a malului.
Tunelurile construite pe aceasta linie sunt unele dintre cele mai solide de pe intreaga magistrala; se poate observa folosirea traverselor din beton la traversarea tunelului, in majoritatea celorlalte tuneluri romanesti se folosesc inca traverse de lemn.
europa.iet.unipi.it /pix/ro/misc/tunnel/pix.html   (1329 words)

  
 Turism - Muntii Carpati - Parcul National Portile de Fier
Formele de relief sunt deosebit de spectaculoase: versanti abrupti, chiar prapastiosi, vai inguste, pesteri in pereti stancosi ai defileului.
Frumusetea si unicitatea zonei inpun masuri de conservare si protectie, mai ales ca Sistemul hidroenergetic "Portile de Fier" se afla in imediata apropiere.
Efectele vecinatatii s-au facut deja simtite: prin umplerea lacului de acumulare, insula Ada-Kaleh, situata la 3 km aval de Orsova, a fost complet inundata, disparand astfel un biotop specific cu un mare numar de elemente mediteraneene (chiparos, migdal,castan comestibil, leandru etc.).
www.ici.ro /romania/ro/turism/c_portiledefier.html   (302 words)

  
 Evenimentul Zilei Nr. 4830
The state registered a loss of EUR64 million for the modernization of Portile de Fier 2 energy complex by paying in advance for something it never received.
Former industries’ minister Dan Ioan Popescu turned Portile de Fier 2 into a “den of treasures” for VA Tech company.
The justification was that “there was need of continuity “ of eth works started at Portile de Fier 1 in 1997.
www.expres.ro /article.php?artid=295187   (324 words)

  
 I.S.C.E - Institutul de Studii si Consultanta Energetica   (Site not responding. Last check: 2007-10-14)
Studiu si dotarea a 40 hidrogeneratoare cu puteri peste 25 MW cu instalatii de masurare a descarcarilor partiale în înfasurarile statorice, pentru determinarea starii tehnice a izolatiei
Amenajarile hidroenergetice de pe râurile Bistrita, Dunare, Arges, Olt, Sebes, Râul Mare, Tismana
Priza din nodul de presiune subteran Sasciori, pentru alimentarea cu apa a municipiului Alba.
www.isce.ro /p04_1.html   (955 words)

  
 Cronica Romana - Cotidian National de Informatie si Atitudine - Editia On-Line :: Economic
Potrivit Codului de procedura fiscala aprobat prin Ordonanta Guvernului nr.92/2003, republicata, impozitele, taxele, contributiile si alte sume datorate bugetului general consolidat se stabilesc, potrivit prevederilor Codului fiscal si Codului de procedura fiscala, republicat, prin declaratie fiscala sau prin decizie emisa de organul fiscal.
Potrivit datelor furnizate de KTD Invest, desi valoarea totala a tranzactiilor a fost semnificativ mai redusa decat in ziua precedenta, insumand numai aproximativ 1,8 milioane de dolari, sedinta bursiera de ieri a fost una destul de animata.
Dintre cei 58 de emitenti tranzactionati, doar pentru 12 preturile au ramas nemodificate in comparatie cu sesiunea anterioara, 15 au inregistrat cresteri ale cotatiilor, iar 31 au marcat scaderi ale valorii de piata.
www.cronicaromana.ro /2004-07-28--economic.html   (483 words)

  
 VA Tech Hydro va plati daune pentru Portile de Fier I, 4 milioane $ Esential HotNews.ro - revista presei, stiri, ziare, ...   (Site not responding. Last check: 2007-10-14)
„Contractul de modernizare a hidrocentralei de la Portile de Fier prevede intr-adevar obligatii de acest fel, asumate de partea elvetiana, dar Hidroelectrica are dreptul sa ceara daune doar in momentul in care nu mai poate sa produca energie electrica la intreaga capacitate a hidrocentralei“, spun sursele noastre.
Povestea retehnologizarii hidrocentralei Portile de Fier II (PF2) incepe in noiembrie 2000.
Corneliu Iacobov a fost arestat pentru 25 de zile
new.revistapresei.ro /articol_16413-VA-Tech-Hydro-va-plati-daune-pentru-Portile-de-Fier-I-4-milioane.htm   (931 words)

  
 [No title]   (Site not responding. Last check: 2007-10-14)
Incepind cu prima zi a acestei luni, tara noastra a introdus in mod unilateral regimul de vize pentru cetatenii Uniunii Serbia Muntenegru.
Zilnic ies din tara doar 15-20 de cetateni romani in conditiile in care inainte acestia erau de ordinul sutelor.
Ca dovada, pe primul semestru al acestui an, Punctul de Frontiera Portile de Fier I a fost tranzitat de peste 380.000 de persoane.
www.gds.ro /print/27826   (244 words)

  
 Gardianul: Grup modernizat la Portile-de-Fier
Reforma zaharului: Fabricile de zahar rentabile vor trebui sa finanteze restructurarea celor falimentare
Lucrarile de retehnologizare la cel de-al treilea hidroagregat al hidrocentralei Portile-de-Fier I au fost finalizate, acesta urmand sa fie pus in functiune in zilele urmatoare, a anuntat directorul general al societatii Hidroelectrica, Eugen Pena.
Lucrarile au inceput la mijlocul lunii august 2001 si au fost coordonate de concernul multinational VA Tech Hydro Ltd. Energomontaj Bucuresti, UCM Resita si Electroputere Craiova au fost subantreprenori in cadrul proiectului.
www.gardianul.ro /index.php?a=economie2002062403.xml   (211 words)

  
 ZIUA
Aici este un joc extrem de net, de dur, nu intr-un sens vulgar dur, dar care are regulile lui precise, si, din pacate, as spune ca nu se constientizeaza suficient faptul ca pentru noi relatia cu SUA are un caracter strategic.
in limita a 500 de semne, dar fara a depasi jumatate din articolul sau stirea in cauza.
In cazul nerespectarii acestor conditii, ZIUA isi rezerva dreptul de a actiona in judecata datorita violarii legislatiei in vigoare privind drepturile intelectuale.
www.ziua.ro /display.php?id=7666&data=2005-03-25&ziua=988575a6bf3c208f58ca9bb1b8c0057d   (1261 words)

  
 Parcul Natural Portile de Fier - Pagină de start
Limita sudică a parcului este reprezentată de Fluviul Dunărea ce crează aici cel mai lung şi unul dintre cele mai spectaculoase defilee din Europa.
Defileul românesc al Dunării prezintă atât sectoare de îngustare cât şi sectoare de lărgire.
Influenţa aerului cald de origine submediteraneeană conferă valori mai ridicate ale temperaturii în comparaţie cu restul ţării, media multianuală fiind de cca 11˚C. În regiunea Parcului Natural Porţile de Fier se manifestă vânturi cu caracter local şi brize specifice defileului create datorită diferenţelor de temperatură dintre apă şi versanţii calcaroşi puternic încălziţi.
www.portiledefierpn.ro /site-portile.htm   (638 words)

Try your search on: Qwika (all wikis)

Factbites
  About us   |   Why use us?   |   Reviews   |   Press   |   Contact us  
Copyright © 2005-2007 www.factbites.com Usage implies agreement with terms.