| |
| | [No title] |
 | | The Intermediate Ring Road (188 km) circumventing the city beyond the proposed BDA Peripheral Road (110 km) connecting Tattekere, Harohalli, Bidadi, Thippagondanahalli. |
 | | Radial Roads (262 km) will connect the existing Outer Ring Road and the proposed Peripheral Road of the BDA as well as the BMRDA proposed Intermediate Ring Road and Satellite Town Ring Road. |
 | | Ring roads for Ramanagaram, Kanakapura, Anekal, Hoskote, Devanahalli, Doddaballapur, Nelamangala, Magadi towns that will be connected by Satellite Town Ring Road and Intermediate Ring Road. |
| www.hinduonnet.com /thehindu/thscrip/print.pl?file=2006080114890400.htm&date=2006/08/01/&prd=th& (222 words) |
|