Factbites
 Where results make sense
About us   |   Why use us?   |   Reviews   |   PR   |   Contact us  

Topic: STS 44


  
  MagKnits, your friendly online knitting magazine
C2F: Sl 1 st to cable needle, k 1 st from left needle, k st from cable needle.
C2F with the two sts on either side of the gap (this will twist the sts to close the gap caused by the gusset).
44 (48, 52, 56) sts on needles (not including the held sts for the thumb).
www.magknits.com /Sept05/patterns/urban.htm   (1904 words)

  
 [No title]
It may be necessary to bring the thumb sts forward just until sts slip behind the latches for the first 4 rows.
Make the transfer tool decreases on the other half, then remove the 10 (8-10) sts remaining for tip on WY. Return sts for first half into their hooks with the transfer tool and knit to correspond.
Make the transfer tool decreases on the other half, then remove the 12 (10-10) sts remaining for tip on WY. Return sts for first half into their hooks with the transfer tool and knit to correspond.
www.clearwaterknits.com /freepats/mittens1.html   (927 words)

  
 Moda Dea Dream Knitted Sweater
Change to larger needles and work in St st, beg K row, until 14 1/2 (15, 15, 15 1/4, 15 1/4, 15 3/4) inches from beg, end P row.
Dec 1 st at armhole edge every K row 4 times AND AT THE SAME TIME dec 1 st at center front edge on next 1 (3, 2, 4, 3, 3) K rows, then every 4th row 1 (0, 1, 0, 0, 0) time(s)—34 (35, 37, 39, 42, 44) sts.
Change to larger needles and work in St st, beg K row, shaping sides by inc 1 st each end of next row, then every 4 (4, 4, 6, 4, 4)th row 2 (2, 3, 17, 6, 2) times—50 (50, 54, 84, 62, 56) sts.
www.michaels.com /art/online/projectsheet?pid=25001&categoryid=32   (880 words)

  
 Berroco® Free Pattern | Jessica Henley   (Site not responding. Last check: 2007-11-06)
Keeping 1 st at front edge in Garter St and remaining sts in St st, continue to shape armhole same as for back until 31(35-38-41-44) sts remain.
Bind off 3(3-3-4-4) sts at neck edge once, 2 sts twice, then dec 1 st at neck edge every RS row twice.
Inc 1 st each side of next row, then every 6th row 0(0-1-9-13) times more, every 8th row 0(7-10-4-1) times, every 10th row 5(3-0-0-0) times, and every 12th row 3(0-0-0-0) times.
www.edy.org /freePattern/jessica_henley.html   (749 words)

  
 Felted Mittens Pattern
In circular stockinette st, approximately 9 sts and 12 rows equal 2".
Place 11 gusset sts on a thread and CO 3 sts at back of thumb [44 (52) sts].
Transfer 11 (13) sts from holder to 2 needles and pick up 5 (7) sts from back of thumb on 3rd needle, 16 (20) sts total.
www.allfiberarts.com /library/bl/blfeltedmitts.htm   (346 words)

  
 OPAL BRAZIL BABY SET PATTERN
Cast on 40 (42, 44) sts for the first sleeve and knit garter st. for 5 rows.
Knit the sts of the front, then the sts of the sleeve, and (again with the same thread!) make another 36 (42, 48) sts for the back (134, 152, 170 sts).
So decrease 1 stitch at each side of the row in every 4th row until 40 (42, 44) sts and finish with knitting 5 rows in garter stitch at a height of 12 (16, 20) cm.
www.ptyarn.com /futurepattern.html   (607 words)

  
 KNITTING INSTRUCTIONS
Change to size 8 needles and st st to 10 (10 1/2, 11) inches (or make a pattern to same length).
P and sl to holder 9 sts, P and sl to a 2nd holder for neck the center 15 (15, 17) sts, P to end.
Work in st st (or desired pattern) on the 32(34, 34) sts INC 1 st each side every 6th row 6 (6, 7) times.
www.geocities.com /marcyellen/2k.html   (1104 words)

  
 STS 101 Mission Specialist: James Voss
A veteran of three spaceflights, he was a mission specialist on STS 44 in 1991 and STS 53 in 1992, as well as a payload commander on STS 69 in 1995: STS 44 (November 24 to December 1, 1991) - This particular shuttle flight was dedicated to initiatives from the Department of the Defense.
STS 53 (December 2-9, 1992) - This mission was another Department of Defense (DoD) dedicated mission, the primary payload and the details of which remain classified.
STS 69 (September 7-18, 1995) - During this mission the crew performed a spacewalk to test construction methods that would be employed for the International Space Station (ISS).
www.space.com /peopleinterviews/sts101_voss_bio.html   (434 words)

  
 Knits Corrections for Spring 1999   (Site not responding. Last check: 2007-11-06)
GAUGE 20 sts and 27 rows = 4" (10 cm) in rev St st and patterns on larger needles.
Work rev St st until piece measures 5 (5 1/2, 5 3/4, 6 1/4, 6 3/4, 7 1/4)" (12.5 [14, 14.5, 16, 17, 18.5] cm) from beg, ending with a RS row.
When chart is completed, cont in rev St st until armhole measures 7 (7 3/4, 8 1/4, 8 1/2, 8 1/2, 9)", ending with a WS row.
www.interweave.com /knit/interweave_knits/corrections/bamboo.asp   (1277 words)

  
 Fast Sweater Jacket
Continuing to dec 1 st at arm edge every other row 3 (4-6) times more, dec 1 st at same edge every other row 3 (4-6) times.
Row 3: P 1, sl next 4 sts onto a d p needle and hold in back of work, K thc next 4 sts, K 4 sts from d p needle, P 1.
Keeping center 10sts in C C cable pattern st, inc 1 st each end of needle every 1 inch 10 (13-16) times.
www.knitting-crochet.com /fasswejac.html   (575 words)

  
 Model Pattie Boyd
into these 3 sts., slip next st. on to right-hand needle dropping loop as before, then slip this st. back on to left-hand needle, K.1, P.1, K.1 into this st., rep. from * to last st., K.1.
Next row-Cast off 44 (one st. on needle after cast-off), patt.
Rejoin Fuzzy-Wuzzy to remaining group of 22 sts.
www.angelfire.com /music3/sentstarr/hood2knit.html   (279 words)

  
 Coats & Clark - Fun & Free - Tri-Cable Pullover   (Site not responding. Last check: 2007-11-06)
Dec 1 st at each end of next 2 WS rows – 38 (44, 50) sts.
Continue in established pat, shaping sides by inc 1 st each end of next row, then every 4th row 3 (1, 0) times, then every 6th row 5 (7, 8) times – 42 (44, 46) sts.
Dec 1 st each end of every WS row twice, then each end of every row 5 (7, 9) times – 20 (18, 16) sts.
www.coatsandclark.com /fun_and_free/yarn/lw1438.htm   (692 words)

  
 Big Net Brioche Cowl Pullover - free knitting pattern from Crystal Palace Yarns
Dec 1 st at each end of 5th (5th, 7th) row once, then at each end of following 4th (6th, 6th) row once, 33 (37, 41) st. Inc 1 st at each end of every 6th row 3 times, 39 (43, 47) sts.
Dec 1 st at each end of every row 1 (3,4) times, then dec 1 st at each end of every 2nd row 6 (6, 5) times, then dec 1 st at each end of every row 3 (3, 4) times.
Pick up and knit 6 sts from right back neck edge, 7 (7, 7) sts from back neck holder, 6 sts from left back neck edge, 9 sts from right front neck edge, 5 (5,7) sts from front neck holder and 9 sts from left front neck edge.
www.straw.com /cpy/patterns/bignet_brio_pull.html   (877 words)

  
 Caron International | Free Project   (Site not responding. Last check: 2007-11-06)
Stockinette stitch (St st): Knit side = RS CO 66 (72, 78) sts; beg St st. Work even until piece measures 13 (13.5, 14)” from beg, end WS row.
Shape Shoulders and Neck (RS): BO 6 (7, 6) sts beg of next 2 rows, then 5 (5, 6) sts at beg of next 4 rows for shoulders – 20 (22, 24) sts rem; place rem sts on holder for neck.
CO 42 (44, 46) sts; beg St st. Work even until piece measures 11" from beg, end with WS row.
www.caron.com /projects/jb/pro_jb_knit_splitcol.html   (467 words)

  
 knitty.com
Decrease round [dec rnd]: K to last 3 sts on first needle; k2tog, k1.
Join sts in round with 11[13] sts on needle 1; 22[26] sts on needle 2; 11[13] sts on needle 3.
BO as follows: K 1 st from each needle [2 sts total] together.
www.knitty.com /ISSUEspring03/PATTprepschool.html   (387 words)

  
 Chenille Thick & Quick Double-Breasted Vest
Row 2 K the purl sts, p the knit sts.
Work 2 rows in Seed st. Continue in St st until piece measures 13 (12 1/2, 12, 12 1/2, 12, 12)" from beg, end after a WS row.
Work 2 rows in Seed st. Next row (RS) Work in St st to last 3 sts, work 3 sts in Seed st. Next row (WS) Slip 1 st, work 2 sts in Seed st, purl to end.
www.michaels.com /art/online/projectsheet?pid=e02065&categoryid=32   (906 words)

  
 Free Knitting Pattern: WOOLSPUN Easy Cable Vest
Est Pat: Row 1 (RS): K 3 (garter st vent), p 6 (9,10,12,14,17), Cable Pat Row 1 on next 8 sts, p 18 (18, 20, 22, 22, 22), Cable Pat Row 1 on next 8 sts, p 6 (9, 10, 12, 14, 17), k 3 (garter st vent).
Dec 1 st inside garter st borders each side every row 2 (4, 4,5,6,7) times, then every other row 2 times -40 (40, 42, 44, 44, 44) sts.
Est Pat: Row 1 (RS): K 3 (garter st vent), p 6 (9, 10, 12, 14, 17), Cable Pat Row 1 on next 8 sts, P 10 (10, 11, 12, 12, 12), k 4 (garter st front band).
www.lionbrand.com /patterns/kws-easyCableVest.html   (928 words)

  
 Berroco® Free Pattern | Magda
When increasing or decreasing in Pat St, if there are not enough sts to work a complete repeat, work sts remaining in St st.
Shape Neck: Work until there are 30(34-38-42-45) sts on RH needle, join another hank of yarn and bind off center 25(25-27-27-29) sts, work to end.
Using yarn from frontband, pick up and k20(20-21-21-22) sts along right front neck edge, 30(30-32-32-34) sts across back neck edge, 20(20-21-21-22) sts along left front neck edge, then work 13 sts from left holder in ribing as established – 96(96-100-100-104) sts.
www.berroco.com /191/191_magda.html   (650 words)

  
 MagKnits, your friendly online knitting magazine
Increase round: *knit to 1 st before marker, k-f/b, sm, k-f/b; rep from * at each marker, knit to end of round; 8 sts increased (1 st each side of each raglan seam); 128, (144, 148, 148, 152, 156) sts on needle.
Straight: k to first marker, cast off all sts between here and the next marker, k across the front sts to next marker, cast off all sts between here and the next marker, k to end of round.
K to armhole edge, cast on 17 (20, 21, 26, 31, 34), join to front sts and k across them to armhole edge, cast on 17 (20, 21, 26, 31, 34), join to back sts, k to end of round; 154 (176, 198, 220, 242, 264) sts.
www.magknits.com /Aug05/picovoli.htm   (1614 words)

  
 Knitting Patterns :: Children's Two Needle Knit Mitten Pattern
With A, cast on 36 (44, 44) sts loosely.
K 1 row, increasing 4 sts evenly spaced across row; 40 (44, 48) sts.
Take up sts of back of hand, join A in last st, with same needle, pick up and k 7 (8, 9) sts on cast-on thumb sts, take up and k palm sts to same needle; 40 (44, 48) sts.
www.purplekittyyarns.com /freepatterns/children-knit-mittensa.html   (745 words)

  
 knitty.com
There will be 26[28,30,32,34,36,38] sts in each sleeve section and 32[34,36,38,40,42,44] sts in each body section.
Work across 32[34,36,38,40,42,44] sts of front body section, remove marker, place 26[28,30,32,34,36,38] sts of sleeve section on waste yarn, keep next marker on needle, work across 32[34,36,38,40,42,44] sts of back body section, remove marker, place 26[28,30,32,34,36,38] sts of rem sleeve section on waste yarn, keep final marker on needle.
64[68, 72, 76, 80, 84, 88] sts on needle.
knitty.com /ISSUEwinter04/PATTcathode.html   (681 words)

  
 Coats & Clark - Fun & Free - Wrap Coat   (Site not responding. Last check: 2007-11-06)
Bind off next 10 sts, work across next 36 (40, 44, 48) sts including st on needle after bind-off; turn and leave rem 36 (38, 40, 42) sts on a holder.
Bind off next 10 sts, work to end – 26 (28, 30, 32) sts.
Work in Garter st for 6", then work in pat, shaping sides by inc 1 st each end of 3rd row, then every 4 (6, 6, 5)th row until there are 40 (44, 44, 48) sts, working added sts into pat.
www.coatsandclark.com /fun_and_free/yarn/lw1334.htm   (555 words)

  
 Addendum Braies - long
Row 6: Purl, inc. 1 st at beginning and end of row (44 sts).
Row 12: Purl, inc. 1 st at beginning and end of row (46 sts).
Row 18: Purl, inc. 1 st at beginning and end of row (48 sts).
www.usitt.org /tdt.index/extras/39-3braieslong.html   (335 words)

  
 Bond America® / Jewel Box Splitneck Pullover
Stockinette stitch (St st): Knit side = RS Using closed-edge cast on method and MY, CO 66 (72, 78) sts.
K 1 R. Dec 1 st ea side next R. 52 (56, 60) sts rem.
K 1 R. Dec 1 st at neck edge next 2 R. 20 (21, 22) sts rem.
www.bond-america.com /projects/usm_proj/usm_jb_splitneck.html   (249 words)

  
 Untitled
These two rows are continued until there are 44 sts on needle.
Repeat the 2nd row until all sts are worked off onto one needle (24 sts).
Knit across in rib, pick up 15 sts, and taking a second needle, pick up 14 along the garter st edge, work across the 24 sts at the top in rib.
www.suite101.com /print_article.cfm/6598/47840   (271 words)

  
 Free Knitting Pattern: WOOL-EASE Ear Flap Hats   (Site not responding. Last check: 2007-11-06)
ssk (slip, slip, knit) Slip next 2 sts as if to knit, one at a time, to right needle; insert left needle into fronts of these 2 sts and k them tog.
Cast on 88 (96,104) sts, divide sts evenly across needles.
Skip 40 (43, 45) sts across front and repeat instructions above for 2nd earflap.
www.lionbrand.com /patterns/kwe-earflapHat.html   (478 words)

  
 ipedia.com: Space Shuttle program Article   (Site not responding. Last check: 2007-11-06)
In January 2004, it was announced that the Shuttle fleet would be replaced by 2010.
The shuttle is officially referred to in NASA jargon as the Space Transportation System, or STS.
LC-39B STS Launches: STS-51-L, STS-26, STS-27, STS-29, STS-30, STS-28, STS-34, STS-33, STS-31, STS-41, STS-35, STS-37, STS-40, STS-49, STS-46, STS-47, STS-52, STS-54, STS-56, STS-57, STS-51, STS-58, STS-61, STS-62, STS-64, STS-66, STS-63, STS-70, STS-73, STS-72, STS-75, STS-76, STS-77, STS-78, STS-80, STS-81, STS-87, STS-90, STS-95, STS-93, STS-103, STS-106, STS-97, STS-102, STS-104, STS-108, STS-110, STS-112, STS-114.
www.ipedia.com /space_shuttle_program.html   (3563 words)

  
 STS-105 Crew Members
Scott Horowitz, 44, an Air Force colonel and former test pilot with a Ph.D. in aerospace engineering, will command Discovery's STS-105 mission and be responsible for its safety and success.
Patrick Forrester, 44, is an Army lieutenant colonel, former test pilot and Army Ranger with a master's in mechanical and aerospace engineering.
He also will be primary operator of the shuttle's robotic arm during berthing and unberthing of the Multipurpose Logistics Module.
www.shuttlepresskit.com /STS-105/crew.htm   (1256 words)

  
 Astronaut Frederick D. Gregory   (Site not responding. Last check: 2007-11-06)
This is a signed and inscribed 8 x 10 inch official NASA photo of Astronaut Frederick D. Gregory who flew on STS 51-B, STS 33 and STS-44.
Also included with this photo is an official 4 inch NASA flight patch for the crew of Challenger STS 51-B of which Gregory was the Pilot.
STS 51-B was launched 29 April 1985 and landed 6 May 1985.
www.nmia.com /~valorc/american/space/gregory.html   (163 words)

  
 Ford Truck World -- Forum: Washington Chapter (Anyone running 42's or 44's?)   (Site not responding. Last check: 2007-11-06)
I'd get the 44" bogger if I wasn't a broke ass college student not being able to pop $1700 every year.
A 44" STS is 122lb and $416 a piece.
However, both the Irok and the STS is 21" wide, and that would require me to get 16.5 or 17x14 wheels which would up the cost even more.
ftw.truckmoxie.com /forums/topic.ten-id-275963   (629 words)

  
 STS-44 Encyclopedia Article, Definition, History, Biography   (Site not responding. Last check: 2007-11-06)
Looking For sts 44 - Find sts 44 and more at Lycos Search.
Find sts 44 - Your relevant result is a click away!
Look for sts 44 - Find sts 44 at one of the best sites the Internet has to offer!
www.karr.net /encyclopedia/STS-44   (466 words)

Try your search on: Qwika (all wikis)

Factbites
  About us   |   Why use us?   |   Reviews   |   Press   |   Contact us  
Copyright © 2005-2007 www.factbites.com Usage implies agreement with terms.