STS-31 - Factbites
 Factbites
 Where results make sense
About us   |   Why use us?   |   Reviews   |   PR   |   Contact us  

Topic: STS-31


    Note: these results are not from the primary (high quality) database.


  
 Japanese Charted Patterns, Lesson 2
So, when knitting this pattern, we cast on 130 sts at tension appropriate for ribbing, which is usually 2 full numbers less than Stockinette tension.
Push the 10 HP shoulder sts back half way to upper work pos, Knit 1 row to the right with main color, then remove on waste yarn.
A large intarsia pattern begins 31 rows above the waistband, as indicated by the line across the lower Front, and the row symbol plus numeral 31 on the right side.
www.clearwaterknits.com /charting/jpchart2.html   (1634 words)

  
 STS-41-B
STS 41-B was the tenth flight of a Space Shuttle and the fourth for Challenger.
Thus, the next flight, instead of being designated STS-10, became STS 41-B. The new numbering system was designed to be more specific in that the first numeral stood for the fiscal year in which the launch was to take place, the "4" being 1984.
The seventh day of the mission, both astronauts performed an EVA to practice capture procedures for the Solar Maximum Mission satellite retrieval and repair operation planned for the next mission, STS 41-C. Another important "first" for STS 41-B was the reflight of the West German-sponsored SPAS-l pallet/satellite originally flown on STS-7.
www.worldhistory.com /wiki/S/STS-41-B.htm   (731 words)

  
 One Piece Baby Sweater
Dividing Row: P4, K 17(18-19), CO 4 sts (keep on the body needle), place next 28(31-33) sts on holder for sleeve, K 38(40-44), CO 4 sts (keep on the body needle), place next 28(31-33) sts on holder for sleeve, K 17(18-19) P4.
Work even in stockinette st except for the P4 at the beginning and end of every K row(knit 1 row, purl 1 row) until piece measures 5 ½(6-6 ½)" from CO sts at under arm.
Work even in stock st until piece measures 4 ½(5-5 ½)" from CO sts at underarm.
www.geocities.com /Heartland/Ranch/4054/babysweaterfront.htm   (613 words)

  
 Soyuz TM-31 - Wikipedia, the free encyclopedia
The crew of two Russian and one American cosmonauts spent over three months in the ISS, and returned to Earth in an American shuttle (STS 102) in February 2001.
In the initial days, the crew brought a variety of life support systems on-line, and created a lap-top computer network that helped run all systems in the ISS.
The Progress M1-3 cargo craft that remains docked with Zvezda will first be evicted to make way for the Soyuz.
en.wikipedia.org /wiki/Soyuz_TM-31   (176 words)

  
 Coats & Clark - Fun & Free - Casual Friday Vest
Now dec 1 st at neck edge only every right side row until 25 (26, 28, 31) sts rem, then every 4th row until 17 (18, 20, 22) sts rem.
Dec 1 st at each neck edge on next 2 right side rows AND AT THE SAME TIME when back measures same as front to shoulder, bind off 8 (9, 10, 11) sts at beg (arm edge) of next 2 rows, then 9 (9, 10, 11) sts at same edge of next 2 rows.
Bind off 5 (5, 6, 6) sts at beg of next 2 rows, 3 (4, 4, 5) sts at beg of next 2 rows, then 2 (3, 3, 4) sts at beg of next 2 rows.
www.coatsandclark.com /fun_and_free/crochet_thread/lc1259.htm   (839 words)

  
 Big Net Brioche Cowl Pullover - free knitting pattern from Crystal Palace Yarns
Continue until armhole measures 6 (6, 6.75)" [18 (18, 20) rows], 29 (31,33) sts remaining.
Pick up and knit 6 sts from right back neck edge, 7 (7, 7) sts from back neck holder, 6 sts from left back neck edge, 9 sts from right front neck edge, 5 (5,7) sts from front neck holder and 9 sts from left front neck edge.
Dec 1 st at each end of 5th (5th, 7th) row once, then at each end of following 4th (6th, 6th) row once, 33 (37, 41) st. Inc 1 st at each end of every 6th row 3 times, 39 (43, 47) sts.
www.straw.com /cpy/patterns/bignet_brio_pull.html   (877 words)

  
 Coats & Clark - Fun & Free - Snow Gear, Children's Knit Accessories
Work in K1, P1 ribbing for 2 (21/2, 21/2)" inc 1 st on last row – 27 (29, 31) sts.
Shape Thumb Gusset: K14 (15, 16), place marker, [inc in next st] twice, place marker, K to end – 29 (31, 33) sts.
Hand: With right side facing, attach yarn to last st on 2nd holder, pick up and K2 sts at base of thumb, K across 11 (12, 13) sts on first holder.
www.coatsandclark.com /fun_and_free/yarn/womans_day_mag/lw1413.htm   (907 words)

  
 NASA STS-109 Mission
The building collapsed in Damietta at 31 N., for an evil king, and 31 E. The Hubble Space Telescope was launched on STS-31.
The building was at 31 N., for an evil king, and 31 E. Hubble was launched on STS-31.
Vice President Cheney was headed to the Middle East today to round up support for military action against Saddam Hussein, and Yasser Arafat's terrorists are proving unfit for civilization.
www.biblenews1.com /history2/20020227STS109.htm   (1810 words)

  
 Grace Cardigan
Dec 1 st at front edge only on next and following alt rows until there are 31 (31-36) sts, then on following 4th rows until there are 26 (27-30) sts.
Rep 15th to 18th rows for pat inc 1 st each end of needle on next and following 4th rows to 77 (87-93) sts, then every following 6th row until there are 99 (105-109) sts taking inc sts into pat.
GAUGE 22 sts and 30 rows = 4 ins [10 cm] with larger needles in stocking st.
www.michaels.com /art/online/projectsheet?pid=e02382&categoryid=32   (890 words)

  
 Berroco® Free Pattern Suzette
With smaller needles, cast on 2 sts, * cast on 2 sts, pass the first over the second, rep from * 42(46-50-54-58) times, cast on 2 – 46(50-54-58-62) sts on needle.
With smaller needles, cast on 2 sts, * cast on 2 sts, pass the first over the second, rep from * 17(17-18-18-20) times, cast on 2 sts – 21(21-22-22-24) sts on needle.
With smaller needles, cast on 2 sts, * cast on 2 sts, pass the first over the second, rep from * 38(41-44-46-49) times, cast on 2 – 42(45-48-50-53) sts on needle.
www.berroco.com /188/188_suzette.html   (825 words)

  
 Rocket Lightning Photographed From Space Shuttle
Somewhere 31 kilometers above the thundercloud, there must have been a concentration of electrical charge that acted as a "terminal" for the bolt.
The lightning discharge was determined to be at least 31 km long.
www.science-frontiers.com /sf084/sf084g11.htm   (279 words)

  
 Cotton Chenille Textured Sweatshirt - free pattern from Crystal Palace Yarns
Continue in pattern as for rows 1 -4, at the same time, dec (as in row 8) every 6th row until 31 sts rem.
Next row: WS: Beg with a purl row, work in St st. Change to smaller single point needles and dec 4 sts evenly across row.
Knit in the round, dec'ing 8 sts evenly on first row.
www.straw.com /cpy/patterns/cpy9602.html   (537 words)

  
 Complex 31: Challenger STS-51L remains
Almost a year after Challenger STS-51L exploded in flight, it is laid to rest in an unused missile silo at Cape Canaveral Air Force Station's Complex 31.
www.robsv.com /cape/c31_h.html   (27 words)

  
 The Observatorium - Observation of the Week
The Space Transportation System (STS) is NASA's name for the overall space shuttle program, including intergovernmental agency requirements and international projects.
Right image: Space shuttle Endeavour with the HST during the telescope's first servicing mission (STS-61), orbiting at an altitude of 356 nautical miles.
(STS is the acronym for Space Transportation System.)
observe.arc.nasa.gov /nasa/ootw/1997/ootw_970205/ob970205.html   (1174 words)

  
 Space Shuttle Mission Chronology
Countdown briefly halted at T- 31 seconds when computer software failed to shut down a fuel valve line on ground support equipment.
Launch April 10 scrubbed at T-4 minutes due to faulty valve in auxiliary power unit (APU) number one.
Engineers ordered valve to shut and countdown continued.
www-pao.ksc.nasa.gov /kscpao/chron/sts-31.htm   (129 words)

  
 STS31MR.HTM
A 16.8-second OMS separation maneuver was performed as planned at 291:23:30:02.2 G.m.t., with a differential velocity of 31 ft/sec.
During the mission, the APU 3 drain line pressure slowly increased to 26 psi while the pump inlet pressure slowly decreased to 139 psi.
members.aol.com /WSNTWOYOU/STS31MR.HTM   (1626 words)

  
 Yarn Forward - Danny Sweater Free Pattern
18 sts and 24 rows to 4 inches [10 cm] on a US 7 [4.5mm] needle or whichever size is needed to obtain the required tension.
Increase one stitch at each end of every 4th Row, until 60 (66,72) sts, and then work straight until you have finished 5 (6, 7) bands plus the border.
Cast off 4 sts at the start of each row for 10 rows.
www.yarnfwd.com /uk/danny2free.html   (411 words)

  
 www.magknits.com
Row 3: work 1st two sts together (either purl or knit, whichever is appropriate for the stitch patterning), sd st to end.
Row 2: Sd st 5 sts, p2tog, p to last 7 sts, p2 tog tbl, sd st. 5 sts.
Row 1: Sd st 5 sts, ssk, k to last 7 sts, k2tog, sd st 5 sts.
www.magknits.com /warm05/patterns/coldshoulder.htm   (900 words)

  
 knitty.com
BO 5[5, 6, 6, 6, 6] sts at beg of next round, k to marker, place rem sts on st holder or spare circular needle.
Begin stripe patt and work in St st, keeping marker at beg of round and placing another marker after 74[82, 90, 98, 106, 114] sts.
Next Row [WS]: P1, slip next 2 sts knitwise, place slipped sts back on left needle and p tog tbl, p to 3 stitches from end, slip next two sts knitwise, place slipped sts back on left needle and p tog, p1.
knitty.com /ISSUEwinter04/PATTleftovers.html   (1744 words)

  
 Claudia's Aran
Continue dec 1 sts at armhole edge only on every alt row until 2 sts remain.
Keeping pattern as set, increase 1 sts at each end of next and every following 6th row until 61 sts, then on 3rd and every following 4th row until 81 sts.
On size 3.75mm needles, cast on 36 sts and work 6 cm in k1, p1 rib.
www.dimbleby.net /knitting/mypatt/aran1/aran1.html   (964 words)

  
 Free Knitting Pattern: WOOL-EASE Strawberry Patch Cardigan and Cap
Working sts before and after markers with MC in St st, work through chart Row 31.
Bind off from neck edge 2 (3) sts twice, 2 sts twice-19 sts.
Change to larger needles and beg with a k row, work in St st, AT SAME TIME, inc 1 st each side every 4th row 0 (3) times, every 6th row 10 times-55 (63) sts.
www.lionbrand.com /patterns/kwe-strawberry.html   (909 words)

  
 Knitted Lace = antique knitted lace, vintage lace pattern, knit, knitted.
To begin, cast on 31 sts and k once across.
Row 21: K 4, YO, k 2 tog, eyelet, k 2, eyelet twice, k 2, eyelet, k 1, O twice, k 2 tog, k 1 (31 sts).
Row 10: K 1, k 2 tog, p 1, k 2 tog, k 17, YO, k 2 tog, k 2 (25 sts).
www.knitting-crochet.com /knitlace.html   (499 words)

  
 Charlie Bolden
He was selected as an astronaut candidate by NASA in 1980, qualifying as a Space Shuttle pilot in 1981, and subsequently flying four missions on the Space Transportation System (STS): STS-61C, STS-31, STS-45, and STS-60.
During his first mission on board the Space Shuttle Columbia—STS-61C, 12-18 January 1986, he participated in the successful deployment of the SATCOM KU Satellite and conducted experiments in astrophysics and materials processing.
Designated a naval aviator in May 1970, he flew more than 100 combat missions in North and South Vietnam, Laos, and Cambodia, in the Grumman A-6 Intruder, while assigned to Marine Fighter Squadron 533 at Nam Phong, Thailand, from June 1972 to June 1973.
www.au.af.mil /au/goe/eaglebios/01bios/bolden01.htm   (490 words)

  
 Spaceflight Now Plus | STS-31 video archive
The countdown is stopped at T-minus 31 seconds due to a problem with the outboard liquid oxygen fill and drain valve.
Shuttle launch director Bob Sieck polls senior managers for a "go" to launch Discovery and then passes a message to commander Loren Shriver.
Listen in as the launch team successfully works through the glitch.
spaceflightnow.com /plus/sts31.html   (1113 words)

  
 Articles - STS-41-D
Because of the 2-month delay, the STS 41-F mission was cancelled (STS 41-E had already been cancelled) and its primary payloads were included on the STS 41-D flight.
Another payload was the OAST-l solar array, a device 13 feet (4 m) wide, and 102 feet (31 m) high, which folded into a package 7 inches (180 mm) deep.
The wing carried a number of different types of experimental solar cells and was extended to its full height several times.
www.gaple.com /articles/STS-41-D   (612 words)

  
 I feel so dumb. - Is it Friday yet?
Confirm this on the second row, where you k3, p25, k3 (31 sts).
The pattern increases to 31 on the first pattern row you work.
Then once you get to the end of the row, you'll be able to see right away if the pattern has gone astray, since you should still have the 3 knit sts left after the marker.
www.ginnysanchez.com /nucleus/index.php?itemid=222   (922 words)

  
 Hello Yarn Handspun Yarns.... Cycling Aran Free Knitting Pattern
Beginning on row 1 again, this time following chart, including center cable sts., knit to 17”, then bind off 4 sts.
To set up for cables, do rows 1 and 2 from chart, leaving out the center cables, working those sts.
row to end up with 65 sts., keeping in rib pattern.
www.helloyarn.com /cyclingaran.htm   (439 words)

  
 STS EC90-129-6: STS-31 on Runway 22 at Edwards with Recovery Personnel
STS EC90-129-6: STS-31 on Runway 22 at Edwards with Recovery Personnel
Dryden Home > Collections > Photo Home > Space Shuttle (STS) > Photo # EC90-129-6
www.dfrc.nasa.gov /Gallery/Photo/STS/HTML/EC90-129-6.html   (658 words)

  
 prog3205.txt
Soybeans: Percent Setting Pods, Selected States 1/ -------------------------------------- : Week Ending : :-----------------------: 2000- State:Jul 31,:Jul 24,:Jul 31,: 2004 : 2005 : 2005 : 2004 : Avg.
Cotton: Percent Setting Bolls, Selected States 1/ -------------------------------------- : Week Ending : :-----------------------: 2000- State:Jul 31,:Jul 24,:Jul 31,: 2004 : 2005 : 2005 : 2004 : Avg.
Peanuts: Percent Pegging, Selected States 1/ -------------------------------------- : Week Ending : :-----------------------: 2000- State:Jul 31,:Jul 24,:Jul 31,: 2004 : 2005 : 2005 : 2004 : Avg.
usda.mannlib.cornell.edu /reports/nassr/field/weather/2005/crop/prog3205.txt   (1259 words)

  
 Astronaut Steven A. Hawley.
This is a signed and inscribe 8 x 10 inch official NASA photo of Astronaut Steven A. Hawley who flew on STS 41-D, STS 61-C, STS-31 and STS-82.
STS 41-D was launched 30 August 1984 and landed 5 September 1984.
Also included with this photo is an official 4 inch NASA flight patch for the Discovery crew of STS 41-D of which Hawley was Mission Specialist 3.
www.nmia.com /~valorc/american/space/hawley.html   (134 words)

Try your search on: Qwika (all wikis)

Factbites
  About us   |   Why use us?   |   Reviews   |   Press   |   Contact us  
Copyright © 2005-2007 www.factbites.com Usage implies agreement with terms.