 | | While the tunnel was originally designed to carry the 8220;Shinkansen”;, the bullet train, on a route between the two islands, by the time the tunnel had been completed, 15-years late and $6½ million over budget, the country could no longer afford the cost of connecting it up. |
 | | When the tunnel was finished in 1988, it carried over 3 million people; which figure has been receding regularly since and today stands at around 1.9 million, almost 200,000 less then the 2.07 million passengers the Seikan ferries registered in their final year. |
 | | In particular, the signal circuit for the Seikan Tunnel is based on an uninsulated rail circuit, which does not require insulated connections, and so rails were welded together to form a single rail that runs the length of the tunnel. |