| |
| | Journal Press - County ahead of schedule on road, slip repairs (Site not responding. Last check: 2007-10-01) |
 | | The county is looking into realigning the area around the slip at the lower end of Georgetown Road in Miller Township to take some of the dip out, he said. |
 | | On Pribble Road, in Lawrenceburg and Miller townships, culverts are being replaced. |
 | | Slip repairs on North Hogan Road, which spans Hogan and Center townships, Salt Fork Road, Miller Township, and Short Ridge Road, Hogan Township, are in the design phase, said Shelley. |
| www.zwire.com /site/news.cfm?newsid=5183593&BRD=2075&PAG=461&dept_id=386538&rfi=6 (655 words) |
|