| |
| | PA Bulletin, Doc. No. 96-105e |
 | | The planning area included under the plan was the northern area of Williams Township, contiguous to the City of Easton, in close proximity to the Delaware River, and along Interstate 78. |
 | | A major permit modification to modify the final cover system at the landfill to include: 24 inches of final cover soil, a geocomposite drainage layer, a 40 mil textured geomembrane, 6 inches of subbase soil layer and 12 inches of intermediate cover was issued by the Regional Office on January 3, 1996. |
 | | On December 21, 1995, plan approval was issued to Rescar, Inc. of Pennsylvania (7702 FM 1960, Suite 232, Humble, TX 77346) for the construction of a rail car surface coating operation in the City of DuBois, Clearfield County. |
| www.pabulletin.com /secure/data/vol26/26-4/105e.html (4105 words) |
|