| |
| | Boat Background |
 | | On the spot the Navy bought the rights to the drawings for the "swift boat." Sewart Seacraft was also asked to prepare some modified drawings, that were to include a gun tub, ammo lockers, bunks, and a small galley. |
 | | These craft were permanently assigned to Coronado as training boats for the new PCF crews and maintenance team personnel, who had begun to arrive in strength at the Amphibious Base by mid-September of 1965. |
 | | A total of one hundred seventy-one (171) Mark I, II and III swift boats were constructed for the United States Navy, the Philippine Navy, Thailand, Cambodia, Brazil and Zaire. |
| swiftboats.net /extras/boat_background.htm (749 words) |
|