| |
| | Tyco Flow Control Pacific |
 | | Tyco Tamar designed, supplied, installed, and commissioned all equipment required for the project, including penstock, valves, turbine, generator, switchboards, substation, hydraulic power pack and local and remote control systems to interface with the existing communication facilities. |
 | | Tyco Tamar’s sub-contract covered the design, supply, installation and commissioning of the turbine, alternator and associated equipment, including switchboards, hydraulic power pack and control system to interface with the existing water supply requirements. |
 | | Tyco Tamar’s sub-contract covered the design, supply and commissioning of the turbine, alternator and associated equipment, including switchboards, hydraulic power pack and a complex control system to interface with the existing water supply requirements. |
| www.tamar.com.au /project_work (1287 words) |
|