| |
| | No. 299-M:11/30/94:The Department of Defense notified the C (Site not responding. Last check: 2007-11-02) |
 | | Included in the proposed sale would be four spare Hellfire launchers, 34 2.75" rocket launchers, six spare T-700 GE engines, one spare Target Acquisition Designation Sight/Pilot Night Vision Sensor system, spare and repair parts, support equipment, a Integrated Helmet and Display Sight System, facility design and construction and other related elements of logistics support. |
 | | The proposed sale of this equipment and support would not affect the basic military balance in the region and would cause no adverse impact on U.S. defense readiness. |
 | | The principal contractors for the major equipment would be McDonnell Douglas Helicopter Systems, Mesa, Ariz., Martin Marietta Electronics and Missiles Group, Orlando, Fla., and General Electric, Lynn, Mass. |
| www.defenselink.mil /news/Nov1994/m113094_m299-94.html (267 words) |
|