In the News (Tue 22 Dec 09)

  
  turbine - Hutchinson encyclopedia article about turbine   (Site not responding. Last check: 2007-11-05)
Steam turbines are used to drive generators in power stations and ships' propellers; water turbines spin the generators in hydroelectric power plants; and gas turbines (as jet engines; see jet propulsion) power most aircraft and drive machines in industry.
Impulse turbines work on the same principle as the water wheel and consist of sets of buckets arranged around the edge of a wheel; reaction turbines look much like propellers and are fully immersed in the water.
In a gas turbine a compressed mixture of air and gas, or vaporized fuel, is ignited, and the hot gases produced expand through the turbine blades, spinning the rotor.
encyclopedia.farlex.com /turbine   (670 words)

  
 Turbine, Ontario - Encyclopedia.WorldSearch   (Site not responding. Last check: 2007-11-05)
Turbine is a community in the Ontario city of Greater Sudbury.
From 1973 to 2000, Turbine was part of the town of Walden, in the Regional Municipality of Sudbury.
On January 1, 2001, the Regional Municipality was dissolved into the single-tier City of Greater Sudbury.
encyclopedia.worldsearch.com /turbine,_ontario.htm   (140 words)

  
 Electricity Generation Using Small Wind Turbines At Your Home Or Farm   (Site not responding. Last check: 2007-11-05)
Small wind turbines, (see Figure 1), which are generally defined as producing no more than 100 kW of electricity, are designed to be installed at homes, farms and small businesses either as a source of backup electricity, or to offset use of utility power and reduce electricity bills.
The actual power production from a wind turbine will be influenced by many other factors, such as: the efficiency that the wind turbine is able to extract energy from the wind; the elevation at which the turbine is located; and other design characteristics of the wind turbine.
Large turbines turbine blades rotate in the range of at 50-15 rpm at constant speed, although an increasing number of machines operate at a variable speed.
www.gov.on.ca /OMAFRA/english/engineer/facts/03-047.htm   (3609 words)

  
 Community Wind: The Third Way by Paul Gipe
Wind turbines, for example, can be placed in one's backyard, near a factory, on a farm, at a harbor, within cities as in Toronto, or even offshore from cities as near Copenhagen.
This modularity enables placing wind turbines nearer the load than possible with large, centralized power plants, providing the resiliency necessary for stable electricity networks that was identified twenty years ago by Amory and Hunter Lovins in their book Brittle Power.
The turbines' production would then be used to offset the retail rate on coop members' electricity bills in proportion to the amount of investment each had in the turbine.
www.ontario-sea.org /CommunityWind/CommunityWind.html   (2100 words)

  
 [No title]
Installing new turbines and upgrading turbine runners has increased the installed capacity of Ontario Hydro’s hydroelectric generating units Computerized peak efficiency controllers (see Appendix 3) used in conjunction with updated servo motors have improved the efficiency of the hydroelectric cycle in plants where major capital investments were not justified.
Ontario Hydro’s CO2 emissions will be stabilized at 1990 levels of 26 Tg by the year 2000.
Ontario Hydro is operating within current emission regulations so the emission reductions created are early and surplus.
www.coolaction.com /docs/OPGprotocol.1.doc   (1126 words)

  
 Ontario Power Generation - Green Power   (Site not responding. Last check: 2007-11-05)
This, combined with the introduction of new electricity marketing rules in Ontario, could result in more homeowners becoming energy self-sufficient, at times sending power into the grid and at other times receiving the power from their local utility.
Net metering is a practice that allows small power producer, such as a residence or farm with a wind turbine or solar installation, to connect to the electrical power grid.
The Ontario government is studying a recommendation that policies and procedures be developed to permit net metering across the province.
www.opg.com /envComm/E_greenPower_renewable.asp   (844 words)

  
 Planet Ark : Ontario opens North America's biggest windmill
The turbine, with a capacity of 1.8 megawatts - or enough to power for about 600 homes - is located beside the utility's Pickering nuclear power station, just east of Toronto.
Ontario Power is also studying the idea of a 10 MW wind farm in the Bruce Peninsula, on Lake Huron.
One small turbine, about one-third the size of the Pickering unit, is already operational there and the firm is in talks with manufacturers to buy eight to 15 more, he said.
www.planetark.org /dailynewsstory.cfm/newsid/12137/story.htm   (531 words)

  
 Ontario Waterpower Association   (Site not responding. Last check: 2007-11-05)
The force of the water turns the blades of the turbine which then turns the shaft inside the turbine.
The shaft inside the turbine is connected to a generator, which generates electricity.
Once the water passes the turbine it flows through a draft tube out of the station and back into the river.
www.owa.ca /edu_how_works.html   (184 words)

  
 Croman - Applications - District Heating and Co-generation - Ontario Hydro 2 out of 3 Overspeed Protection Device   (Site not responding. Last check: 2007-11-05)
Ontario Hydro 2 out of 3 Overspeed Protection Device: The application is four steam turbine boiler feed pumps feeding the boilers.
The boilers are used to produce the steam required by the 650 MW steam generators.
This gear was mounted in side the casing of the turbine, mounted directly on the steam turbine main shaft.
www.cromancontrols.com /applications/applications_district_heating_doc2.htm   (315 words)

  
 Ontario Power Generation - Green Power   (Site not responding. Last check: 2007-11-05)
Capacity of this 117-metre turbine (measured from the ground to the highest blade tip), called the Pickering Wind Generating Station, is 1.8 MW.
OPG also operates the oldest commercial wind turbine in the province, a 600 KW turbine in operation since 1995 in Bruce County.
Dr James reports three apparent casualties related to the turbine, a level of mortality that is “absolutely insignificant when compared to tall buildings and communications towers that each regularly kill hundreds of birds each year,” he said.
www.opg.com /envComm/E_greenPower_what.asp   (815 words)

  
 Various mentions of Wind Turbine risks
-- A turbine at a wind farm near Weatherford collapsed Friday morning.
Wind snaps off turbine blade A LARGE blade from a ten-tonne wind turbine at Scotland’s most powerful wind farm has snapped off during high winds.
The turbine at Crystal Rig wind farm near Dunbar was destroyed when a device to stop it spinning too fast failed.
www.aandc.org /research/wind_noise3.html   (231 words)

  
 Environmental Studies at York
The three large blades of the wind turbine, 29 meters in length each, will convert the energy of the strong winds blowing from Lake Ontario into enough electricity to meet the needs of 250 typical Ontario houses, even more if the homes are energy efficient, a goal which Windshare is also pursuing.
Fortunately, modern wind turbines are quiet, and have far less impact on birds than do Toronto’s tall, night time-illuminated buildings, or Toronto’s cat population, or the tens of thousands of cars driving in Toronto.
Windshare members members receive an annual financial dividend proportional to the number of shares of the turbine they own and their share in the sale of the electricity generated by the turbine.
www.yorku.ca /fes/envedu/gr10civics.asp   (1438 words)

  
 CanWEA/ACEE WindLink - Issue #7
Germany’s Enercon GmbH and GE Wind Energy have settled an ongoing patent dispute over variable speed wind turbine technology “on a worldwide and long-term basis by means of a cross-license,” the companies said in a news release.
A more sustainable, reliable and affordable electricity system in Ontario is possible without coal-fired or nuclear power if the province acts now to adopt proven energy efficient technologies and low-impact renewable energy sources, says a new study from the Pembina Institute and the Canadian Environmental Law Association.
Among the report’s recommendations is a call for the province to issue requests for proposals for 4500 MW of renewable capacity by 2010, 7100 MW by 2015 and 9800 MW by 2020.
www.canwea.ca /downloads/WindLink/Issue_8.html   (1855 words)

  
 Wind Power Comes to Ontario
According to Ontario Power Generation (OPG), "Wind power is one of the fastest growing sources of electricity generation in the world." OPG's contribution to this particular "green power" movement involves the current operation of two Ontario wind turbine facilities.
The turbine was manufactured by Vestas Wind Systems, the world's largest manufacturer of wind turbines, in Denmark.
Once completed, the turbine was shipped by sea to Oshawa in various compartments, and the compartments were then trucked from the Oshawa port to the Pickering site.
www.perc.ca /PEN/2003-02/s-wardman.html   (569 words)

  
 [No title]   (Site not responding. Last check: 2007-11-05)
Installation of the turbine structure, which stands on the Canadian National Exhibition grounds near the bandshell, began earlier this month.
The wind turbine -- the first in North America to be built in an urban setting-- is co-owned by Toronto Hydro and Windshare, a co-operative community organization that first proposed a turbine for Toronto five years ago.
It is the 10th wind turbine in Ontario.
www.electricityforum.com /news/dec02/dec44.html   (448 words)

  
 Ontario Ministry of Energy :: Conservation : Wind Energy Info Sheet   (Site not responding. Last check: 2007-11-05)
This 1.8 MW turbine is part of Huron Wind Farm, the province’s first commercial-scale wind farm.
The energy output of a wind turbine can vary dramatically depending on the size and height of the turbine, wind speed, temperature, barometric pressure and altitude.  Depending on these factors, a modern wind turbine (1 - 2 megawatts) generates enough energy for 250 - 600 homes.
This Toronto waterfront wind turbine is the first in a community-owned initiative known as Windshare, a project of the Toronto Renewable Energy Co-op (TREC) in partnership with Toronto Hydro Energy Services.
www.energy.gov.on.ca /index.cfm?fuseaction=conservation.windinfosheet   (803 words)

  
 CNW Group   (Site not responding. Last check: 2007-11-05)
The Exhibition Place Wind Turbine Bird Monitoring Study was conducted during the spring and fall migration periods of 2003.
They flew either east or west of the turbine until they were north of it before landing nearby to the north.
Dr. James joined the Department of Ornithology at the Royal Ontario Museum in 1966 and in 1973 was appointed Curator of Ornithology.
www.newswire.ca /en/releases/archive/February2004/05/c6996.html   (1606 words)

  
 [No title]   (Site not responding. Last check: 2007-11-05)
Rain, snow, sleet or storms the Lakota SC turbine is made to take it all and continue to put out the power.
In addition, since the blades are very light they can take advantage of wind gusts that heavier blades can't because their inertia is too high to react before the gust is over.
Unlike plastic with powdered carbon blades that bend and flutter, the carbon fibers in the Lakota blades are 7 times stiffer than common steel, and carry the loads from tip to root.
www.truenorthpower.com /printturbine.html   (814 words)

  
 Gaia Power: Kingston City Council Confirms Support or Lake Ontario Park Single Turbine Project   (Site not responding. Last check: 2007-11-05)
Council demonstrated near unanimous support for the Lake Ontario Park Single Turbine Project, voting 12 to 1 in favour of the proposal.
The turbine will be used as a training facility for St. Lawrence Colleges new Renewable Energy Technician and Technologist programs, and could be co-located with the College's "Renewable Energy House" portable classroom that will educate school tours, tourists and the general public about ecologically responsible energy choices.
By proving the viability of Kingston's wind resource and the support of the community and municipal government, this project will be a catalyst for further development of the $600 million worth of wind power projects proposed for the region.
www.gaiapower.com /news/kcclop   (295 words)

  
 OSEA's Comments on Ontario's RFP for 300 MW of Renewables
The RFP/RFQ issued by NERA on behalf of Ontario for 300 MW makes no provision for small projects, farmer-owned projects, community-owned projects, or cooperative projects.
It appears to the Ontario Sustainable Energy Association that the province's RFP process is
In sum Ontario's RFP/RFQ process limits access to power purchase agreements to only a select few.
www.ontario-sea.org /FarmWind/CommentsonRFP.html   (138 words)

  
 GE Provides Turbine for Ontario Wind Project
A recent example, the Melancthon Grey Wind Project, is among the first utility-scale wind projects to be developed in the province of Ontario and will use GE Energy's 1.5-MW wind turbines to add 67.5 MW of wind capacity to the country's growing total.
Located near Shelburne, 70 km northwest of Toronto, Melancthon Grey is among five new wind projects recently approved by the government of Ontario.
Groundbreaking for the project is expected to occur in the spring of 2005, with commercial operation expected no later than March 30, 2006.
tdworld.com /news/Canadian-wind-projects   (581 words)

  
 Gryphon's Mechanical Services   (Site not responding. Last check: 2007-11-05)
Marie, Ontario - 110 MW combined-cycle cogeneration plant providing electrical power to the Ontario grid and process steam to St. Marys Paper Inc. - two x 40 MW gas turbines and 25 MW steam turbine - conceptual and detailed design, feasibility studies, Owners' engineer and procurement services.
Jungbunzlauer Canada – Port Colborne, Ontario – Central Utilities Plant – Conceptual and detail design of a 2 x 5 MW gas turbine generator cogeneration plant.
Ontario Power Generation - Bruce Generating Station - Alternate Steam Supply - Detail design for a 450,000 lb/hr oil fired steam plant.
www.niagara.com /gryphon/services/mech.htm   (827 words)

  
 Canada   (Site not responding. Last check: 2007-11-05)
Bourget, Ontario, Canada -- www.woodnstuff.ca I live in on 88 acres in a rural area just 20 miles from Ottawa.
Richmond Hill, Ontario, Canada -- Hello There, I'm a newbie, interested in experimenting with the combination solar collector-Tesla turbine for the purposes of generating electricity.
Eldorado, Ontario, Canada -- My interest in alternative power sources is becoming greater as the use of fossil fuels and POLLUTION become greater.
phoenixnavigation.com /ptbc/memcanada.htm   (1062 words)

  
 Wind Power Ontario.   (Site not responding. Last check: 2007-11-05)
You have probably seen wind turbines in your province or state and often wondered about them.
In some cases, Wind Power Ontario - the most convenient way for Americans to support wind power development is by participating in green power programs.
They require a meter for the wind generator to be tied to the grid.
www.windgeneratedpower.com /theforums/messages/910.html   (713 words)

  
 Gryphon's Civil & Structural Services   (Site not responding. Last check: 2007-11-05)
Lake Superior Power - HRSG Enclosures - Sault Ste Marie, Ontario - New building of approximately 30 x 20 x 23 m high dimensions, enclosed two (2) HRSG units, including maintenance spaces for the removal of the LM6000 gas turbines from their packages, and a connection to the main power plant building.
Potter Power Station - 40 MW Gas Turbine Generator Replacement Project - Tunis, Ontario - A piled foundation was designed for the new LM6000 GTG package, along with associated modifications to the existing building and ducting.
Union Gas Power - Ford Windsor Powerhouse - 28.5 MW Steam Turbine Generator Project - An existing concrete high tuned “tabletop” foundation was adapted and modified with steel and concrete works to accommodate a new 28.5 MW extraction-condensing steam turbine generator set, including static and dynamic analysis.
www.gryphoneng.com /services/civil.htm   (753 words)

  
 Gas Turbine Generators featuring GE LM6000, Frame 9 and General Electric Frame 5
Two GE Gas Turbine Generators Frame 5, 18.5Mw, 50Hz - · 2 Units: Gas Turbine Out-Put-18.5 Mw (Each) Rating (Iso) · Standards- 14.800 Kw (Each) · Manufactured By- G.E · Fuel Operated-.
The Turbine is skid mounted, housed in weatherproof enclosure.
Province of Ontario Business Advisory Watch - This is a Ontario business advisory for clients and associate businesses with finical interest in the Province of Ontario or that are planing on investing in future business within Ontario
warp-machinery-exchange.com /gas-turbine-generators/gas-turbine-generators.html   (529 words)

  
 Ontario Co-operative Association   (Site not responding. Last check: 2007-11-05)
"This is just the first wind turbine in Ontario," says Young, who sees TREC becoming a co-operative of co-ops for renewable energy everywhere in Ontario.
The French River community group chose CCA Ontario as one of the designated technical assistance providers, with the Conseil de la Cooperation de l'Ontario (CCO) taking the lead.
CCA Ontario will provide contract staff to help the group create a co-operative funding alliance this fall.
www.ontario.coop /News/funfactfa1998.htm   (2053 words)

  
 Green Party of Ontario - News   (Site not responding. Last check: 2007-11-05)
HURON PARK — Frank de Jong, Leader of the Green Party of Ontario, joined by candidates John Cowling, Shelley Hannah and Tim van Bodegom, today met with Campbell Bolwell, the CEO of Bolwell Corporation, Canada's largest manufacturer of wind turbine blades, to explore the benefits of wind power.
Worldwide, wind turbines generate more than 27,000 megawatts of electricity, a figure that is increasing by 30 per cent each year.
In 2002 Danish wind turbine companies supplied 3,600 megawatts of new generating capacity — 20 per cent of the country’s capacity — equivalent to five medium-sized nuclear power station blocks.
www.greenparty.on.ca /news/press_release/fulltext.shtml?x=215   (694 words)

  
 RYERSON UNIVERSITY: Wind Turbine Research   (Site not responding. Last check: 2007-11-05)
The Huron Wind Farm on the shore of Lake Huron in Bruce County northwest of Tiverton in the municipality of Kincardine (5x1.8MW) – commercial,
Bruce Wind Turbine in Tiverton (600kW) – originally for testing a turbine in the Canadian climate
Ferndale Wind Farm on the Bruce Peninsula (~2 additional 1.8MW turbines) – associated with Green Tags Ontario and
www.ee.ryerson.ca /~kmedri   (352 words)

Try your search on: Qwika (all wikis)

Factbites
  About us   |   Why use us?   |   Reviews   |   Press   |   Contact us  
Copyright © 2005-2007 www.factbites.com Usage implies agreement with terms.