| | www.mineweb.net | co_releases Dragon Mining (Site not responding. Last check: 2007-10-13) |
 | | The decision comes just months after Dragon began operations at its Svartliden gold mine in northern Sweden and could be followed by a development decision at a third operation, at Pampalo also in Finland, in the next 12 to 18 months. |
 | | The current life of the three stage Vammala project is forecast to be around 6.5 years but Dr Searle said there was potential for that to be extended if the drilled mineralisation between 400 metres and 600 metres below surface at Jokisivu was converted into mineable reserves. |
 | | Dragon is aiming to commence gold production during 2005 at the Vammala Production Centre in southern Finland, comprising the 322,500oz Jokisivu Project and the 207,900oz Orivesi underground mine, both located with economic cartage distance of its centrally located Vammala treatment facility. |
| www.mineweb.net /co_releases/455429.htm (749 words) |