| | Design Criteria & Specs. for Water Mains & Appurtenances |
 | | All water pipe shall be cleaned and disinfected in accordance with Section II of these specifications. |
 | | Work performed under this Section of the specifications shall include the furnishing of all labor, tools, equipment, and materials; the performance of all work necessary to install water distribution mains, laterals, fittings, valves, fire hydrants, and appurtenances; and the installation of pipe by the jacking and boring method, all complete and ready for use. |
 | | Where water mains and laterals (except service lines) are to be installed in paved streets, roadways, sidewalks, etc., and it is undesirable to install pipe under this surface by means of an open cut trench, the contractor will install this pipe by jacking and boring. |