| |
| | [No title] (Site not responding. Last check: 2007-10-30) |
 | | The Town of Windsor waived the time limits set forth in Section 40-6-109.5(2) and (3), C.R.S. The Commission will determine this matter upon the record, without a formal hearing, under § 406109(5), C.R.S., and Rule 24, Commission Rules of Practice and Procedure, 4 Code of Colorado Regulations ("CCR") 7231, because the application is noncontested and unopposed. |
 | | Findings of Fact The Town of Windsor is constructing a portion of the Poudre River Trail designed to connect Greeley, Colorado to Fort Collins, Colorado, through The Town of Windsor. |
 | | ORDER: The Commission Orders That: The Town of Windsor, is authorized to construct a pedestrian-bicycle trail across the tracks and right-of-way of the Great Western Railway Company, at Colorado State Highway 257 and the intersection of the Kodak Plant entrance in The Town of Windsor. |
| www.dora.state.co.us /PUC/Decisions/2002/C02-0281_01A-288R.doc (833 words) |
|